Solar and renewables in North York Moors

North York Moors received 30 renewable energy applications in the last 12 months, including 3 battery storage sites and 10 heat pumps. All 21 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for North York Moors

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 9 of 9 applications
16 Nov 2026 Live FL/2026/00529

38 High Street, Castleton Whitby, YO21 2DA

removal of oil tank and shed and installation of three air source heat pumps concrete on plinths within two enclosures (part retrospective)

Full Permission North York Moors
11 Nov 2026 Live FL/2026/00518

North Farm, Lead Lane, Nether Silton, YO7 2JZ

removal of existing roof cladding and replacement with colourcoated profile sheeting together with installation of 20 solar panels and erection of lea...

Full Permission North York Moors
10 Nov 2026 Live HP/2026/00527

Long Meadow, Darnholm Road, Goathland Whitby, YO22 5LA

alterations to existing detached double garage including replacement of flat roof with pitched clay pantile roof incorporating solar panels

Householder Permission North York Moors
2 Nov 2026 Live HP/2026/00500

Rose Marie Lodge, Headlands Road, Appleton le Moors, YO62 6TF

removal of existing boiler and lean to greenhouse and installation of Air Source Heat Pump to rear of garage

Householder Permission North York Moors
6 Oct 2026 Live HP/2026/00461

Chapel House, Kildale to Kildale Moor, Kildale, YO21 2RY

installation of roof mounted solar panels to front and rear roof slopes together with two ancillary batteries to rear of dwelling

Householder Permission North York Moors
1 Oct 2026 Live HP/2026/00458

Newton Cragg, Red Gate to Foss Lane, Sneaton, YO22 5JD

construction of upward extension to increase height of dwelling, single storey side extension, two-storey rear extension together with ground mounted ...

Householder Permission North York Moors
10 Sept 2026 Approved 14 Oct FL/2026/00412

Green End Farm, Green End, Goathland Whitby, YO22 5LQ

alterations to holiday cottages comprising installation of solar panels to south east and south west elevations, battery storage to rear elevation and...

Full Permission North York Moors
2 Sept 2026 Live FL/2026/00398

Great Fryupdale Outdoor Residential Centre, Nuns Green Lane to Furnace Farm, Fryup Whitby, YO21 2AP

change of use from outdoor residential centre (Use Class C2) to dwellinghouse (Use Class C3) together with alterations to fenestration and doors and i...

Full Permission North York Moors
1 Sept 2026 Withdrawn HP/2026/00391

Fir Tree, War Memorial to Beck Hole, Beck Hole Goathland, YO22 5LE

installation of solar panels to single storey roof of existing dwellinghouse and air source heat pump, erection of general purpose building (equestria...

Householder Permission North York Moors
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in North York Moors

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in North York Moors?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by North York Moors. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check North York Moors's planning portal daily. New solar & renewables applications appear here within a day of being published.