Solar and renewables in Glamorgan

Glamorgan received 38 renewable energy applications in the last 12 months, including 1 solar farm, 8 battery storage sites and 7 heat pumps. Of the 24 decided so far, 23 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Glamorgan

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 13 of 13 applications
10 Nov 2026 Awaiting Determination (no consults) 2026/00663/LBC

The Old Dairy, Llandow

Retention of Air to Water heat pump (ASHP) that replaced an oil based heating & hot water system and amendment to southern elevation window to store.

Listed Building Consent application Glamorgan
10 Nov 2026 Awaiting Consultation Responses 2026/00504/RG3

Crawshay Court, Eagleswell Road, Llantwit Major

Energy efficiency retrofit works, comprising of 25 flats. Improvements to the thermal performance (via external wall and roof insulation, new windows,...

Vale of Glamorgan Regulation 3 application Glamorgan
9 Nov 2026 Decided 10 Nov 2026/00415/1/CD

Elm Tree Cottage, St Hilary Village, St Hilary

Partial Discharge of Condition 3.(Details / Additional Details) for planning ref 2026/00415//FUL - New roof, windows, doors and external cladding. Ins...

Condition Discharge Glamorgan
27 Oct 2026 Awaiting Consultation Responses 2026/00732/FUL

8 Lakeside, Barry

Renewal of planning app 2021/01365/FUL - Erection of a single-storey side extension and associated alterations to existing dwelling. Including externa...

Full Planning Application Glamorgan
21 Oct 2026 Awaiting Consultation Responses 2026/00743/FUL

Newton Farm, Newton, Cowbridge

Installation of solar power array to rear of dwelling (retrospective).

Full Planning Application Glamorgan
14 Oct 2026 Awaiting Consultation Responses 2026/00740/FUL

Northcliff Rise, Moulton

A new detached double garage and annex. A new detached orangery with adjacent outdoor swimming pool. Installation of Solar Panels and Heat pump.

Full Planning Application Glamorgan
12 Oct 2026 Awaiting Consultation Responses 2026/00728/FUL

11, Orchard Walk, St Athan

Installation of additional solar panels on North/West/East roof, upgrade to solar inverters, Installation of A/C system.

Full Planning Application Glamorgan
7 Oct 2026 Awaiting Consultation Responses 2026/00759/SC1

Port of Barry

Erection of 2 wind turbines

EIA Screening Opinion Glamorgan
1 Oct 2026 Awaiting Consultation Responses 2026/00741/FUL

15 Newbarn Holdings, St Athan Road, Flemingston

installation of air source heat pump to front of property

Full Planning Application Glamorgan
14 Sept 2026 Approved 26 Oct 2026/00553/FUL

11 Baruc Way, Barry

Proposed installation of roof-mounted solar photovoltaic (PV) system and associated battery storage.

Full Planning Application Glamorgan
9 Sept 2026 Approved 14 Sep 2024/00900/1/CD

Pantwilkin Stables, Aberthin

Discharge Conditions 3 (Landscaping scheme) and 7 (Biodiversity Enhancement Details) of Planning Permission 2024/00900/FUL: Variation of condition 2 (...

Condition Discharge Glamorgan
3 Sept 2026 Approved 28 Sep 2026/00415/FUL

Elm Tree Cottage, St Hilary

First floor extension, new roof, windows, doors and external cladding. Installation of solar panels, heat source pump and free-standing sauna.

Full Planning Application Glamorgan
24 Aug 2026 Approved 19 Nov 2026/00633/RG3

Sully Junior And Infants School, Burnham Avenue, Sully

Proposed extension to kitchen, new raised outdoor play area with fencing and canopy over, alterations to fenestration, installation of solar panels an...

Vale of Glamorgan Regulation 3 application Glamorgan
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Glamorgan

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Glamorgan?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Glamorgan. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Glamorgan's planning portal daily. New solar & renewables applications appear here within a day of being published.