Solar and renewables in Cardiff

Cardiff received 36 renewable energy applications in the last 12 months, including 9 battery storage sites and 9 heat pumps. All 25 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Cardiff

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 13 of 13 applications
15 Oct 2026 Registered 26/02176/HSE

Keekorok 9 Maes-y-nant Creigiau Cardiff CF15 9EJ

Installation of air source heat pump to side of property

Householder Planning Permission Cardiff
12 Oct 2026 Registered 26/02146/HSE

5 Heol Dyfed Heath Cardiff CF14 4PN

Erection of a double storey side extension with solar panels on the existing & proposed roof

Householder Planning Permission Cardiff
6 Oct 2026 Registered 26/02103/HSE

21 Llewelyn Goch St Fagans Cardiff CF5 6HR

Proposed installation of an Air Source Heat Pump

Householder Planning Permission Cardiff
24 Sept 2026 Awaiting decision 26/01766/FUL

Alexander House Excelsior Road Gabalfa Cardiff CF14 3AT

Installation of PV panels on the roof of Alexander House and the installation of associated battery energy storage system (BESS) to the rear of Alexan...

Full Planning Permission Cardiff
23 Sept 2026 Registered 26/02021/FUL

Verge Where Nettlefold Road Meets Ocean Way Cardiff CF24 5PJ

Proposed construction and operation of a micro battery storage project.

Full Planning Permission Cardiff
16 Sept 2026 Approved 13 Oct 26/01968/CLPUD

220 - 228 Penarth Road Leckwith Cardiff CF11 8TA

Solar Pv system.

Cert of Lawfulness Proposed (s192) Cardiff
10 Sept 2026 Registered 26/01821/FUL

Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed Cardiff CF23 6XD

Installation of PV panels to NIAC building, two Battery Energy Storage Systems (BESS) and associated national grid infrastructure

Full Planning Permission Cardiff
31 Aug 2026 Registered 26/01834/HSE

2 Pitman Street Pontcanna Cardiff CF11 9DJ

Proposed construction of a new dormer window to the rear elevation roof, install 2 roof windows to the front elevation roof and fix 8 PV Panels to the...

Householder Planning Permission Cardiff
25 Aug 2026 Registered 26/01811/FUL

Land At Lloyd George Avenue Butetown Cardiff

Construction and operation of a micro battery storage project.

Full Planning Permission Cardiff
20 Aug 2026 Approved 25 Sep 26/01771/HSE

19 Lucas Street Cathays Cardiff CF24 4NZ

Proposed installation of two air source heat pump outdoor units

Householder Planning Permission Cardiff
19 Aug 2026 Approved 25 Sep 26/01765/FUL

Cardiff Metropolitan University Llandaff Campus 200 Western Avenue Llandaff Cardiff CF5 2YB

Installation of PV panels on the roofs of buildings within Llandaff campus and the installation of associated battery energy storage system (BESS).

Full Planning Permission Cardiff
19 Aug 2026 Registered 26/01764/FUL

Cardiff Metropolitan University Plas Gwyn Llantrisant Road Llandaff Cardiff CF5 2XJ

Installation of PV panels on the roofs of buildings within Plas Gwyn campus and the installation of associated battery energy storage system (BESS).

Full Planning Permission Cardiff
13 Aug 2026 Approved 8 Oct 26/01728/FUL

Unit 7b Cardiff Industrial Park Pennine Close Llanishen Cardiff CF14 5DN

Installation of 5 no. external air source heat pump units

Full Planning Permission Cardiff
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Cardiff

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Cardiff?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Cardiff. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Cardiff's planning portal daily. New solar & renewables applications appear here within a day of being published.