Solar and renewables in Fife

Fife received 79 renewable energy applications in the last 12 months, including 4 solar farms, 8 battery storage sites and 18 heat pumps. All 50 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Fife

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 22 of 22 applications
17 Nov 2026 Registered 26/02886/FULL

St Monans Parish Church West End St Monans Anstruther Fife KY10 2BX

Change of use from church (Class 10) to events venue (Class 11) and associated cafe (Class 3), and external alterations including installation of door...

Full Planning Permission
12 Nov 2026 Registered 26/02581/FULL

Victory Hall Collessie Cupar Fife KY15 7RQ

Installation of solar panels and replacement windows

Full Planning Permission
5 Nov 2026 Registered 26/02932/FULL

Land At Waterless Farm Cameron Fife

Installation of ground mounted solar PV array and ancillary works associated with planning approval 25/00649/ARC

Full Planning Permission
5 Nov 2026 Awaiting decision 26/02672/PN

12 The Cross West Wemyss Kirkcaldy Fife KY1 4SU

Prior Notification for installation of solar panels

Prior Notification/Approval
2 Nov 2026 Registered 26/02930/CON

Scottish Government Consultation Fife

Consultation for consent to operate for the proposed 300 megawatt (MW) battery energy storage system and associated infrastructure located within the ...

Consultation Request - SG/LA
2 Nov 2026 Registered 26/02929/CON

Scottish Government Consultation Fife

Consultation for consent to operate for the proposed 100 megawatt (MW) battery energy storage system and associated infrastructure located within the ...

Consultation Request - SG/LA
22 Oct 2026 Registered 26/02837/FULL

The Tanhouse Tanhouse Brae Culross Dunfermline Fife KY12 8HX

Installation of solar photovoltaic panels

Full Planning Permission
22 Oct 2026 Registered 26/02699/FULL

Blujade Cottage 6 Hall Row Charlestown Dunfermline Fife KY11 3EG

Replacement single storey extension, installation of 5 rooflights, 5 solar panels, flue, EV charging point, battery and inverter to front, side and re...

Full Planning Permission
16 Oct 2026 Registered 26/02786/FULL

Balgonie House Links Road Leven Fife KY8 4HR

Installation of replacement windows and rooflights, installation of EV charging point with associated apparatus, installation of solar panels and form...

Full Planning Permission
15 Oct 2026 Registered 26/02638/FULL

Newburn House Newburn Drumeldrie Leven Fife KY8 6JE

Proposed installation of ground mounted solar array and shed to house batteries

Full Planning Permission
13 Oct 2026 Registered 26/02710/PPP

Westfield O C C S Fife

Planning permission in principle for restoration and development of former opencast site including power generation/storage; waste recovery/recycling;...

Planning Permission in Principle
13 Oct 2026 Approved 21 Oct 26/02744/APN

Land East Of Meadowend Cottage Balgonar Saline Fife

Prior Notification for Farm-related Building Works - Solar greenhouse

Agricultural Prior Notification
5 Oct 2026 Registered 26/02683/FULL

69 East Leven Street Burntisland Fife KY3 9DX

Installation of canopy to front of dwellinghouse incorporating solar roof panels

Full Planning Permission
25 Sept 2026 Approved 4 Nov 23/02590/NMV1

37 High Street Elie Leven Fife KY9 1BZ

Erection of dwellinghouse and formation of hardstanding (demolition of domestic outbuilding) (Non-Material Variation to footprint of proposed house, r...

Non-Material Variation
24 Sept 2026 Approved 15 Oct 24/00900/NMV1

Craigrothie Village Hall Cupar Road Craigrothie Cupar Fife KY15 5QD

Alterations to village hall including replacement and extended roof and installation of solar panels and formation of bin store (Non-Material Variatio...

Non-Material Variation
16 Sept 2026 Registered 24/00567/NMV1

Farm House Milton Muir Mitchell Place Anstruther Fife KY10 3JD

Erection of 4.no dwellinghouses with integral garages and erection of 2.no self-contained holiday lets (amendment to 23/00273/FULL) (Non Material Vari...

Non-Material Variation
11 Sept 2026 Approved 16 Oct 24/01711/NMV6

Feddinch Mains Feddinch St Andrews Fife

Formation of golf course with driving range, erection of clubhouse, spa and holiday accommodation, gatehouse and agronomy and maintenance buildings (s...

Non-Material Variation
9 Sept 2026 Approved 29 Oct 26/02465/FULL

Heath Cottage Crossgates Cowdenbeath Fife KY4 8ET

Installation of 2 air source heat pumps to rear of dwellinghouse

Full Planning Permission
8 Sept 2026 Decided 29 Sep 26/02646/SCR

Fife Ethylene Plant Mossmorran Fife

EIA screening opinion for alterations to and reuse of offices and warehouses, and erection of an energetics manufacturing facility comprising process ...

EIA Screening
7 Sept 2026 Approved 6 Nov 26/02462/FULL

6 West Lights Tayport Fife DD6 9AW

Formation of balcony and external alterations to dwellinghouse, and installation of freestanding PV panels

Full Planning Permission
1 Sept 2026 Approved 4 Sep 26/02395/CLP

Morven Pattiesmuir Rosyth Fife KY11 3ES

Certificate of Lawfulness - Proposed for installation of 23 No. solar panels on rear roof of dwellinghouse

Certificate of Lawfulness - Proposed Use
28 Aug 2026 Registered 26/02383/FULL

The Farmhouse 1 Old Edinburgh Boarhills St Andrews Fife KY16 8PZ

Installation of 19 No. solar panels on rear roof of dwellinghouse

Full Planning Permission
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Fife

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Fife?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Fife. You can also narrow the alert to a postcode, street, or drawn area.

We check Fife's planning portal daily. New solar & renewables applications appear here within a day of being published.