Solar and renewables in Fife

Fife received 36 renewable energy applications in the last 12 months, including 2 solar farms, 1 battery storage site and 9 heat pumps. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

24
|
8
|
1

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 24 of 24 applications
23/02143/CDC1 13 Jul 2026 Pending

51 High Street Auchtermuchty Cupar Fife KY14 7AR

Formation of external staircase and installation of rooflight and solar panels (Completion of Development Certificate for 23/02143/FULL)

Fife 13 Jul 2026
26/01932/FULL 10 Jul 2026 Pending

Upper Floor 2 South Bridge Cupar Fife KY15 5HY

Change of use and alterations to first floor guide hall (Class 10) to form flatted dwelling house (sui generis) and retail (Class 1) and installation ...

Fife 10 Jul 2026
26/01947/CON 8 Jul 2026 Pending

Scottish Government Consultation Fife

Electricity Act 1989 The Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 1027 Request for scoping opinion for proposed Sect...

Consultation Request - SG/LA Fife 8 Jul 2026
26/01900/FULL 7 Jul 2026 Pending

The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA

Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panel...

Full Planning Permission Fife 7 Jul 2026
26/01774/FULL 26 Jun 2026 Pending

Development Site Glenwood Centre Glenrothes Fife

Amendment to application reference 25/00349/FULL to form additional flatted dwelling (uplift in numbers from 44 to 45), including relocation of air so...

Fife 26 Jun 2026
26/01758/FULL 24 Jun 2026 Pending

180 - 182 High Street Newburgh Cupar Fife KY14 6DZ

Installation of Air Source Heat Pump (ASHP)

Fife 24 Jun 2026
24/00084/NMV1 23 Jun 2026 Pending

Pittenweem Inn 42 Charles Street Pittenweem Anstruther Fife KY10 2QJ

Alterations and extension to building to include installation of windows, doors, flue and air source heat pumps, roofing works, stonework/repointing a...

Fife 23 Jun 2026
21/03531/NMV2 19 Jun 2026 Pending

Strathruddie Energy Centre Limited Kinglassie Lochgelly Fife KY5 0EX

Proposed solar farm up to 25MW, battery storage and associated access and infrastructure (Non-Material Variation for Minor changes to solar/ BESS layo...

Fife 19 Jun 2026
26/01628/CLP 12 Jun 2026 Pending

Roseville Cottage Pattiesmuir Rosyth Fife KY11 3ES

Certificate of lawfulness (proposed) for installation of solar panels to dwellinghouse

Fife 12 Jun 2026
26/01620/SCR 9 Jun 2026 Pending

Wind Turbine Kirkmay Farm Crail Fife

EIA Screening Opinion for erection of single wind turbine (86 metres to blade tip) and associated works

Fife 9 Jun 2026
26/01585/FULL 8 Jun 2026 Pending

Land East Of Lochtyside Cottages Blackwood Road Glenrothes Kirkcaldy Fife KY1 4DE

Construction of ground mounted solar array including erection of substation building, landscaping and associated infrastructure works

Fife 8 Jun 2026
26/01559/CON 3 Jun 2026 Pending

Scottish Government Consultation Fife

ELECTRICITY ACT 1989 - The Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017, The Electricty (Applications for Consent) ...

Fife 3 Jun 2026
26/01536/FULL 2 Jun 2026 Pending

56 South Street St Andrews Fife KY16 9JT

Installation of 10 solar panels to the rear of dwelling

Fife 2 Jun 2026
26/01530/FULL 1 Jun 2026 Pending

Melvaig 6 Lade Braes St Andrews Fife KY16 9ET

Single storey extension to side and installation of air source heat pump to front of dwellinghouse

Fife 1 Jun 2026
26/01520/FULL 29 May 2026 Pending

Nether Rumgally Rumgally Pitscottie Cupar Fife KY15 5SY

Installation of PV panels to dwellinghouse

Fife 29 May 2026
26/00582/CDC1 28 May 2026 Pending

The Old Stables Back Wynd Falkland Cupar Fife KY15 7BX

Installation of solar panels to roof of outbuilding in front curtilage of dwellinghouse (Completion of Development Certificate for 26/00582/FULL)

Fife 28 May 2026
26/01482/PAN 27 May 2026 Pending

Proposed Solar Farm North Of Pitkevy Farm Leslie Fife

Proposal of Application Notice for construction of ground mounted solar array (up to 49.9MW) and associated infrastructure including site access, park...

Fife 27 May 2026
26/01478/FULL 26 May 2026 Pending

1 Balwearie Crescent Kirkcaldy Fife KY2 5LX

Installation of solar panels to existing garage

Fife 26 May 2026
26/01427/FULL 20 May 2026 Pending

5A Pitlethie Steading Pitlethie Road Leuchars St Andrews Fife KY16 0EJ

Installation of air source heat pump to rear and AC unit to front of dwellinghouse

Fife 20 May 2026
24/00852/NMV2 14 May 2026 Pending

New City House Edgar Street Dunfermline Fife

Change of use from offices (Class 4) to form 32.no affordable flatted dwellings (Sui Generis), including alterations to install replacement doors, win...

Fife 14 May 2026
25/02926/NMV1 11 May 2026 Pending

Eden Campus Main Street Guardbridge St Andrews Fife KY16 0UU

Erection of new-build facility for research and development (Class 4) (decarbonising the production of energy, fuels and chemicals) including labs, of...

Fife 11 May 2026
26/01326/CON 7 May 2026 Pending

Scottish Government Consultation Fife

Marine Directorate Consultation for application to vary Section 36 Consent and Marine Licences (00013351/00013352/00013352) for Berwick Bank Wind Farm...

Fife 7 May 2026
26/01218/FULL 27 Apr 2026 Pending

Barnsmuir Farm Barnsmuir Crail Anstruther Fife KY10 3XB

Erection of wind turbine (74 metres to blade tip) and associated works (amendment to 11/05657/FULL)

Fife 27 Apr 2026
26/01145/CLP 20 Apr 2026 Approved

Dunvegan Craigrothie Road Ceres Cupar Fife KY15 5QQ

Certificate of Lawfulness - Proposed for installation of 10 No. solar panels on rear roof of dwellinghouse

Certificate of Lawfulness - Proposed Use Fife 20 Apr 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Fife

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Fife?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Fife. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Fife's planning portal daily. New solar & renewables applications appear here within a day of being published.