Solar and renewables in East Staffordshire

East Staffordshire received 36 renewable energy applications in the last 12 months, including 4 solar farms, 4 battery storage sites and 6 heat pumps. Of the 20 decided so far, 18 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

9
|
1
|
0

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 9 of 9 applications
21 Sept 2026 Live P/2026/01005

26 Ludgate Street, Tutbury, DE13 9NG

Erection of a two storey side and front extension and porch, part two storey and single storey side and rear extension, installation of external insul...

Householder East Staffordshire
7 Sept 2026 Live P/2026/00987

Postern House Farm, Postern Road, Tatenhill, DE13 9SJ

Retrospective application for the alterations to existing conversion by way of relocation of previously approved flue & shared vehicular access to dom...

Detailed Planning Application East Staffordshire
7 Sept 2026 Live P/2026/00988

Postern House Farm, Postern Road, Tatenhill, DE13 9SJ

Retrospective listed building consent for the alterations to existing conversion by way of relocation of previously approved flue & shared vehicular a...

Listed Building Consent East Staffordshire
4 Sept 2026 Live P/2026/00939

Stables on, Rangemore Hill, Rangemore, DE13 9RF

Prior Approval for the conversion of an agricultural building to form one dwelling including single storey rear extension and installation of solar pa...

Prior Approval - Class Q (Agricultural to Dwelling) East Staffordshire
1 Sept 2026 Live P/2026/00955

Leyfield Barn, Henhurst Hill, Burton upon Trent, DE13 9SX

Change of use of 3 bays of an existing outbuilding to incorporate a games room and home office with the installation of windows behind existing garage...

Householder East Staffordshire
17 Aug 2026 Approved 1 Oct P/2026/00895

Environment Agency Uttoxeter Depot, Derby Road, Uttoxeter, ST14 5AA

Installation of 1no. air source heat pump with associated base

Detailed Planning Application East Staffordshire
5 Aug 2026 Approved 25 Sep P/2026/00872

31, Grants Yard, Burton upon Trent, DE14 1BW

Application for a Certificate of Lawfulness for the installation of an Air Source Heat Pump and battery unit to the rear of the property and the insta...

Certificate of Lawfulness - Proposed use/Development East Staffordshire
29 Jul 2026 Approved 23 Sep P/2026/00848

Holland and Barrett Direct, Vitality House, Sixth Avenue, Burton upon Trent, DE14 2WP

Prior Approval for the installation of a solar PV system (totalling 1000kWp) on the South-west and North-east facing roof slopes.

Prior Approval - (Solar PV - Non Dom) (Part 14) Class J East Staffordshire
14 Jul 2026 Live P/2026/00808

Croxden Farm, Croxden Lane, Croxden, ST14 5FB

Change of use of land to garden land, erection of a single storey extension to create plant room and installation of solar panels.

Detailed Planning Application East Staffordshire
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in East Staffordshire

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in East Staffordshire?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by East Staffordshire. You can also narrow the alert to a postcode, street, or drawn area.

We check East Staffordshire's planning portal daily. New solar & renewables applications appear here within a day of being published.