Solar and renewables in East Staffordshire

East Staffordshire received 25 renewable energy applications in the last 12 months, including 4 solar farms, 3 battery storage sites and 6 heat pumps. Of the 12 decided so far, 10 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

6
|
3
|
2

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 6 of 6 applications
P/2026/00895 20 Aug 2026 PENDING

ENVIRONMENT AGENCY UTTOXETER DEPOT, DERBY ROAD, UTTOXETER, ST14 5AA

Installation of 1no. air source heat pump with associated base

East Staffordshire 20 Aug 2026
P/2026/00872 13 Aug 2026 PENDING

31, GRANTS YARD, BURTON UPON TRENT, DE14 1BW

Application for a Certificate of Lawfulness for the installation of an Air Source Heat Pump and battery unit to the rear of the property and the insta...

East Staffordshire 13 Aug 2026
P/2026/00848 4 Aug 2026 PENDING

HOLLAND AND BARRETT DIRECT, VITALITY HOUSE, SIXTH AVENUE, BURTON UPON TRENT, DE14 2WP

Prior Approval for the installation of a solar PV system (totalling 1000kWp) on the South-west and North-east facing roof slopes.

East Staffordshire 4 Aug 2026
P/2026/00614 10 Jun 2026 PENDING

MOLSON COORS BREWING COMPANY, COORS BREWERY, STATION STREET, BURTON UPON TRENT, DE14 1BG

Installation of a centralised heat pump system and associated pipe bridges and ancillary equipment, including pump sets, tanks, electrical transformer...

East Staffordshire 10 Jun 2026
P/2026/00594 9 Jun 2026 PENDING

OAKLANDS FARM, COTON ROAD, WALTON-ON-TRENT, SWADLINCOTE, DE12 8LP

Consultation - non-material change to the Oaklands Farm Solar Park Order 2025 as corrected by The Oaklands Farm Solar Park (Correction) Order 2025 (S....

East Staffordshire 9 Jun 2026
P/2026/00586 4 Jun 2026 Approved

LAND WEST OF MAIN ROAD, CHURCH LANE, BRAILSFORD, DE6 3DA

Consultation - Erection of a ground mounted solar photovoltaic (PV) array, with a total export capacity of up to 55 MW, and associated infrastructure,...

East Staffordshire 4 Jun 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in East Staffordshire

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in East Staffordshire?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by East Staffordshire. You can also narrow the alert to a postcode, street, or drawn area.

We check East Staffordshire's planning portal daily. New solar & renewables applications appear here within a day of being published.