P/2026/00939 - Prior Approval - Class Q (Agricultural to Dwelling) Live

Proposal

Prior Approval for the conversion of an agricultural building to form one dwelling including single storey rear extension and installation of solar panels. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2026
✓
Validated
4 Sept 2026
Decision
Expected by 30 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 30 Oct 2026, from East Staffordshire's recent agricultural works.

The consultation period closed on 3 Oct 2026.

Site constraints 5

Ancient woodland
Rangemore conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 239 m away: Willington C Gas Pipeline
The site is 239 m from the project boundary. Gas pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Ancient woodlandCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area171 m² (1,841 sq ft)
Energy ratingF (36 out of 100), could reach C
PropertyDetached house, 7 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, oil
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in April 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Staffordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval - Class Q (Agricultural to Dwelling)
Postcode
DE13 9RF
Received
26 Aug 2026
Validated
4 Sept 2026
Ward
Bagots & Needwood
Parish
Tatenhill CP
Case officer
Show
Target decision
30 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
ST Architecture and Design Limited

Decision outlook

Day 54 of the 56-day target. East Staffordshire usually decides agricultural works by day 56.

Day 542 days to the 56-day target
60%decided within 8 weeks
75%approved
53decided in the last year

Plota live figures for agricultural works decided by East Staffordshire in the last twelve months, from validation. East Staffordshire decision record →

Consultation & key dates

Alt. reference
EC/2026/00921
Comments by
3 Oct 2026
Committee
26 Aug 2026
Statutory expiry
30 Oct 2026
Env. assessment
No
East Staffordshire
Planning Authority Score
2.6/10
Poor
#246 of 296 councils
Relevant to this application:
Householder decisions

East Staffordshire is one of the slowest councils in England for householder decisions, ranking #294 out of 296. The council extends the time limit on 70% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Staffordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #53 of 296
95%
Householder approved
Above avg (90%) #75 of 296
21%
Decided in 8 weeks
Below avg (63%) #294 of 296
70%
Extended time limit
Above avg (41%) #285 of 296
84%
Minor dwellings approved
57 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
80%
Change of use approved
50 decided
601
Total decisions
45 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.