Solar and renewables in Chichester

Chichester received 32 renewable energy applications in the last 12 months, including 1 battery storage site and 6 heat pumps. Of the 20 decided so far, 18 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

15
|
4
|
2
Get alerts for Chichester

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 15 of 15 applications
26/01829/PA14J 19 Aug 2026 Pending

Dometic Atlantic House 1 - 3 Ellis Square Selsey Chichester West Sussex PO20 0AY

Installation of solar PV panels to the non-domestic pitched rooftop.

Prior Approval Part14 Class J solar Chichester 19 Aug 2026
26/01768/DOM 10 Aug 2026 Pending

12A Whyke Road Chichester West Sussex PO19 7AN

Installation of 6 no. solar PV panels.

Domestic Application (Householder) Chichester 10 Aug 2026
26/01752/FUL 7 Aug 2026 Pending Consideration

Kipson Bank Farm Selsey Road Hunston Chichester West Sussex PO20 1AU

Change use of barns to 1 no. dwelling with open garage and workshop, alongside installation of package treatment plant. (Variation of condition 2 of p...

Full Application Chichester 7 Aug 2026
26/01433/LBC 24 Jul 2026 Pending Consideration

Harrocks Salthill Road Chichester West Sussex PO19 3PY

Installation of 12 no. pv solar panels on main cottage roof and 3 no. pv solar panels on detached roof garage with battery/energy storage system conta...

Listed Building Consent Chichester 24 Jul 2026
26/01515/DOM 22 Jul 2026 Pending Consideration

Berberis Loxwood Road Plaistow Billingshurst West Sussex RH14 0PE

Proposed additional storey and loft room to the existing dwelling, including extension of the first-floor accommodation over the existing rear conserv...

Domestic Application (Householder) Chichester 22 Jul 2026
26/01366/DOM 3 Jul 2026 Withdrawn

Wood Cot Longlands Road East Wittering Chichester West Sussex PO20 8DD

Roof extension, removal of existing roof structure and raising of ridge height to create an additional storey, with rooflights and solar panels. Two s...

Domestic Application (Householder) Chichester 3 Jul 2026
26/01365/FUL 3 Jul 2026 Pending Consideration

Sea Oaks West Strand West Wittering Chichester West Sussex PO20 8AU

Demolition of existing dwelling and replacement with a new dwelling, swimming pool, air source heat pump and landscaping.

Chichester 3 Jul 2026
26/01311/FUL 24 Jun 2026 Approved

Marchwell Buildings Pinewood Way Chichester West Sussex PO19 6EJ

Retrospective (Section 73a) application for photovoltaic panels to the north and the south block.

Full Application Chichester 24 Jun 2026
26/01362/DOM 22 Jun 2026 Approved

32 Oliver Whitby Road Chichester West Sussex PO19 3LW

Proposed 2 storey side extension, front porch and addition of solar PV Panels.

Domestic Application (Householder) Chichester 22 Jun 2026
26/01312/LBC 15 Jun 2026 Approved

Marchwell Buildings Pinewood Way Chichester West Sussex PO19 6EJ

Retrospective (Section 73a) application for photovoltaic panels to the north and the south block.

Listed Building Consent Chichester 15 Jun 2026
26/01161/DOM 9 Jun 2026 Approved

Coromandel Longlands Road East Wittering Chichester West Sussex PO20 8DD

New boundary wall, change in driveway material from block paving to decorative granite, PV panels to garage roof, and change from Air Source Heat Pump...

Domestic Application (Householder) Chichester 9 Jun 2026
26/01056/FUL 3 Jun 2026 Pending Consideration

Land At Hunters Race Farm Hunters Race Lavant Chichester West Sussex PO19 5UD

Installation of a standalone solar PV array, grid connection and associated infrastructure. (Variation of condition 2 of permission 13/00382/FUL- amen...

Full Application Chichester 3 Jun 2026
26/01217/DOM 2 Jun 2026 Approved

2 Tramway Close Donnington Chichester West Sussex PO19 8GN

Installation of an air source heat pump to rear of property.

Domestic Application (Householder) Chichester 2 Jun 2026
26/00710/DOM 28 May 2026 Approved

September House Ursula Square Selsey Chichester West Sussex PO20 0HR

Installation of 12 no. panel domestic ground mounted solar pv array in rear garden.

Domestic Application (Householder) Chichester 28 May 2026
26/00968/FUL 27 May 2026 Pending Decision

St Richards Hospital Spitalfield Lane Chichester West Sussex PO19 6SE

Installation of solar panels and associated infrastructure.

Full Application Chichester 27 May 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Chichester

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Chichester?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Chichester. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Chichester's planning portal daily. New solar & renewables applications appear here within a day of being published.