Solar and renewables in South Downs

South Downs received 30 renewable energy applications in the last 12 months, including 1 solar farm, 1 battery storage site and 7 heat pumps. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

21
|
4
|
0

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 21 of 21 applications
SDNP/26/02670/LIS 8 Jul 2026 Application in Progress

56 North End Ditchling East Sussex BN6 8TG

Conversion of existing double garage into a painting studio, external landscaping for additional parking area and solar PV installation

South Downs 8 Jul 2026
SDNP/26/02669/HOUS 8 Jul 2026 Application in Progress

56 North End Ditchling East Sussex BN6 8TG

Conversion of existing double garage into a painting studio, external landscaping for additional parking area and solar PV installation

South Downs 8 Jul 2026
SDNP/26/02594/LDP 2 Jul 2026 Approved

59 The Avenue Lewes East Sussex BN7 1QU

Installation of no11 solar PV panels to roof

Lawful Development Cert (Proposed) South Downs 2 Jul 2026
SDNP/26/02457/PA14J 23 Jun 2026 Application in Progress

Colliers Farm Midhurst Road Fernhurst West Sussex GU27 3EX

Prior approval - the installation or alteration of solar equipment on the roof slope elevation of the building

Prior Approval PV Equip on Non-Domestic South Downs 23 Jun 2026
SDNP/26/02352/HOUS 15 Jun 2026 Application in Progress

Woodford House Stable Lane Findon West Sussex BN14 0RR

Installation of solar panels on the south facing rear roof. Installation of the battery and inverter on the east side of the house.

Householder South Downs 15 Jun 2026
SDNP/26/02380/HOUS 11 Jun 2026 Application in Progress

Fir Cottage Well Lane Swanmore Hampshire SO32 2QU

SINGLE STOREY EXTENSIONS TO THE REAR (NORTH) AND SIDE (EAST) OF THE EXISTING TWO-STOREY VICTORIAN HOUSE, INCLUDING NEW ENTRANCE PORCH TO THE EAST, AND...

Householder South Downs 11 Jun 2026
SDNP/26/02165/LIS 2 Jun 2026 Application in Progress

107 High Street Lewes East Sussex BN7 1XY

Installation of Air Source Heat Pump to side of house

Listed Building South Downs 2 Jun 2026
SDNP/26/02164/HOUS 2 Jun 2026 Application in Progress

107 High Street Lewes East Sussex BN7 1XY

Installation of Air Source Heat Pump to side of house

Householder South Downs 2 Jun 2026
SDNP/26/02103/FUL 29 May 2026 Decision Pending

Padwicks Farm Whites Lane Bepton West Sussex GU29 0LY

Installation of 45 no. PV panels on framing.

Full Application South Downs 29 May 2026
SDNP/26/02207/ADJAUT 28 May 2026 Decided

South Brooks Solar Farm Kent

Adjoining Authority Consultation - South Brooks Solar Farm

Adjoining Authority Consultation South Downs 28 May 2026
SDNP/26/02031/HOUS 21 May 2026 Approved

19 Homelands Copse Fernhurst West Sussex GU27 3JQ

First floor side extension, single storey side extension and solar panels.

Householder South Downs 21 May 2026
SDNP/26/02026/HOUS 20 May 2026 Application in Progress

11 The Avenue Petersfield Hampshire GU31 4JQ

Installation of Solar PV Panels

Householder South Downs 20 May 2026
SDNP/26/01990/FUL 20 May 2026 Application in Progress

Charlton Court Granary Mouse Lane Steyning West Sussex BN44 3DG

Proposed Solar Array

Full Application South Downs 20 May 2026
SDNP/26/01866/LDP 13 May 2026 Approved

Downlands The Street Poynings West Sussex BN45 7AQ

Installation of 11no roof mounted solar panels to south facing front roof slope

Lawful Development Cert (Proposed) South Downs 13 May 2026
SDNP/26/01827/LIS 12 May 2026 Decision Pending

Arundel View Wepham The Street Burpham West Sussex BN18 9RA

Installation of 8 solar panels, greenhouse and EV charging point and retrospective heat pump

Listed Building South Downs 12 May 2026
SDNP/26/01826/FUL 12 May 2026 Decision Pending

Arundel View Wepham The Street Burpham West Sussex BN18 9RA

Installation of 8 solar panels, greenhouse and EV charging point and retrospective heat pump

Householder South Downs 12 May 2026
SDNP/26/01742/FUL 6 May 2026 Application in Progress

20 South Street Ditchling East Sussex BN6 8UQ

Replacement roof finish, solar panels, replacement windows and construction of a garden room

Full Application South Downs 6 May 2026
SDNP/26/01776/PA14A 1 May 2026 Decided

14 Barons Walk Lewes East Sussex BN7 1EX

Instal 11 solar PV panels on flat roof.

Prior Approval PV Equip on Domestic South Downs 1 May 2026
SDNP/26/01574/CND 20 Apr 2026 Approved

Marsh Cottage Woodcote Graffham West Sussex GU28 0NY

Removal of existing conservatory and 4 no. outbuildings. Single storey rear extension and side extension and erection of 1 no. workshop outbuilding wi...

Removal or Variation of a Condition South Downs 20 Apr 2026
SDNP/26/01468/HRA 14 Apr 2026 Approved

Midhurst Fire Station New Road Midhurst West Sussex GU29 9HY

Regulation 77 - proposed installation of a PV array on the roof of the existing Midhurst Fire Station.

Habitats Regulations Assessment South Downs 14 Apr 2026
SDNP/26/01011/HOUS 2 Mar 2026 Application in Progress

Willow Down Cottage The Street Rodmell East Sussex BN7 3HF

Retrospective installation of 8no solar panels to garage roof

Householder South Downs 2 Mar 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in South Downs

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in South Downs?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by South Downs. You can also narrow the alert to a postcode, street, or drawn area.

We check South Downs's planning portal daily. New solar & renewables applications appear here within a day of being published.