Solar and renewables in Barnet

Barnet received 37 renewable energy applications in the last 12 months, including 14 heat pumps. Of the 23 decided so far, 20 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

14
|
6
|
4
Get alerts for Barnet

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 14 of 14 applications
26/2891/FUL 20 Aug 2026 Pending

27 - 29 Daws Lane London NW7 4SD

Installation of air source heat pumps

Full Application Barnet 20 Aug 2026
26/3030/HSE 18 Aug 2026 Pending

21 Old Fold View Barnet EN5 4EA

Part single, part two storey rear, side and front extensions incorporating front porch following demolition of existing garage and outbuilding. New cr...

Barnet 18 Aug 2026
26/2890/HSE 17 Aug 2026 Pending

Totteridge Park Farm 32 Totteridge Common London N20 8NE

Demolition and replacement of the existing outhouses with installation of solar panels

Householder Application Barnet 17 Aug 2026
26/3011/FUL 17 Aug 2026 Pending

30 Cyprus Road London N3 3RY

Demolition of existing house and the erection of 2no. two storey semi-detached dwellings with rooms in the roofspace. Alterations to vehicular access ...

Full Application Barnet 17 Aug 2026
26/2919/FUL 6 Aug 2026 Pending

113 Wentworth Road London NW11 0RH

Erection of two new detached two storey dwellings with rooms in roofspace, side dormer with obscure side window, 1no. front gable window, 3no. side, 3...

Full Application Barnet 6 Aug 2026
26/2878/HSE 4 Aug 2026 Pending Consideration

19 Fuller Street London NW4 4RR

Installation of an air source heat pump to rear elevation

Householder Application Barnet 4 Aug 2026
26/2711/HSE 23 Jul 2026 Pending Consideration

65 Goldbeaters Grove Edgware HA8 0QE

Installation of roof-mounted photovoltaic (PV) solar panels

Householder Application Barnet 23 Jul 2026
26/2672/LBC 20 Jul 2026 Pending Consideration

Mathilda Marks Kennedy Jewish Primary School 68 Hale Lane London NW7 3RT

Installation of solar panels to roof

Listed Building Consent / Demolition Barnet 20 Jul 2026
26/2623/FUL 14 Jul 2026 Pending Consideration

3 Park Avenue London NW11 7SL

Demolition of existing dwellinghouse and construction of new two storey detached dwellinghouse with room in the roof, associated amenity space, off-st...

Full Application Barnet 14 Jul 2026
26/2548/HSE 9 Jul 2026 Pending Consideration

76 Firs Avenue London N11 3NQ

Installation of air source heat pump to front elevation

Barnet 9 Jul 2026
26/2168/FUL 2 Jul 2026 Pending Consideration

Mathilda Marks Kennedy Jewish Primary School 68 Hale Lane London NW7 3RT

Installation of solar panels to roof

Full Application Barnet 2 Jul 2026
26/2205/HSE 15 Jun 2026 Refused

5 Edgeworth Avenue London NW4 4EX

Part single, part two storey front/side/rear extension with new roof following demolition of the existing garage on the eastern boundary. Part single,...

Householder Application Barnet 15 Jun 2026
26/2096/HSE 9 Jun 2026 Pending Consideration

7 Turners Wood London NW11 6TD

Alterations to an existing rear roof extension; the addition of new double rooflight on flat crown roof. Installation of an air source heat pump (ASHP...

Householder Application Barnet 9 Jun 2026
26/2057/HSE 3 Jun 2026 Approved

3 Golders Park Close London NW11 7QR

Part single, part two storey front and rear extensions. Construction of an additional storey at second floor level. Installation of solar panels to ro...

Householder Application Barnet 3 Jun 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Barnet

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Barnet?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Barnet. You can also narrow the alert to a postcode, street, or drawn area.

We check Barnet's planning portal daily. New solar & renewables applications appear here within a day of being published.