Solar and renewables in Argyll

Argyll received 55 renewable energy applications in the last 12 months, including 8 battery storage sites and 12 heat pumps. All 35 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Argyll

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 21 of 21 applications
17 Nov 2026 Awaiting decision 26/02019/PP

The Blue House Dervaig Isle Of Mull Argyll And Bute PA75 6QJ

Installation of roof mounted solar panels with associated battery, air source heat pump and extract vents

Planning Permission
11 Nov 2026 Awaiting decision 26/01939/PP

Land South West Of Plantation Cottage Moy Campbeltown Argyll And Bute

Erection of dwellinghouse, detached garage and solar array, installation of septic tank and formation of vehicular access

Planning Permission
5 Nov 2026 Awaiting decision 26/02075/S36

High Brenfield Wind Farm Ardrishaig Argyll And Bute

Section 36 Consultation: High Brenfield Wind Farm (ECU Ref: ECU00004961) up to 10 turbines with maximum ground to blade tip height of up to 200 metres...

Electricity Generation consultation
5 Nov 2026 Awaiting decision 26/02044/S36

Corr Chnoc Wind Farm Land Approximately 5KM East Of Oban Argyll And Bute

Section 36 Application: Corr Chnoc Wind Farm (ECU ref: ECU00006023) comprising 12 turbines with maximum ground to blade tip height of up to 200 metres...

Electricity Generation consultation
3 Nov 2026 Awaiting decision 26/01933/PP

Seymour Lodge Shore Road Cove Argyll And Bute G84 0NN

Installation of a free-standing air source heat pump

Planning Permission
26 Oct 2026 Awaiting decision 26/01803/PAGEN

Ardentinny Benderloch Argyll And Bute PA37 1QU

Erection of turbine (height to blade tip 11.8 metres)

Prior Approval MICROGENERATION
20 Oct 2026 Awaiting decision 26/01132/PP

Land At Glen Eilidh Near Allt Chaorain Fasnacloich Argyll And Bute

Construction of a weir across Allt Chaorainn to divert part of the flow into approximately 160m of pipe leading to existing Allt Eilidh intake weir to...

Planning Permission
9 Oct 2026 Awaiting decision 26/01839/S36

Deucheran Hill 2 Windfarm Tayinloan Argyll And Bute

Section 36 Consultation: Deucheran Hill 2 Windfarm (ECU ref: ECU00005208) comprising 14 wind turbines up to 220 metres tip height and associated infra...

Electricity Generation consultation
8 Oct 2026 Decided 26 Oct 26/01803/PNGEN

Ardentinny Benderloch Argyll And Bute PA37 1QU

Erection of turbine (height to blade tip 11.8 metres)

Prior Notif. MICROGENERATION
30 Sept 2026 Awaiting decision 26/01752/S36

Cruach Clenamacrie Wind Farm Glenlonan Oban Argyll And Bute

Section 36 consultation: Cruach Clenamacrie Wind Farm (ECU ref: ECU00004841) (FEI) to construct and operate 6 wind turbines with ground to blade tip h...

Electricity Generation consultation
30 Sept 2026 Approved 13 Nov 26/01522/LIB

North Lodge Ronachan Clachan Argyll And Bute PA29 6XW

Removal of section of existing outhouse, removal of partition in bedroom, formation of en-suite bathroom, installation of new kitchen and bathroom, in...

Application for Listed Building Consent
22 Sept 2026 Awaiting decision 26/01631/PP

9 Sinclair Avenue Inveraray Argyll And Bute PA32 8UL

Installation of roof mounted solar panels with associated external battery

Planning Permission
18 Sept 2026 Awaiting decision 26/01411/PP

Lodge Eleonore Ascog Isle Of Bute Argyll And Bute PA20 9ET

Erection of wind turbine 11.9 metres to blade tip

Planning Permission
10 Sept 2026 Awaiting decision 26/01535/PP

Forest Access Off B8025 Near Arichonan Tayvallich Argyll And Bute

Formation of new visitor car park and stay the night venue, with picnic sites, footpaths, EV charging and chemical toilet disposal point

Planning Permission
10 Sept 2026 Awaiting decision 26/01590/SCRSCO

Helensburgh Golf Course Helensburgh Argyll And Bute

Screening and Scoping request for Residential development (including affordable housing); demolition of the existing and relocation of a new clubhouse...

Screening and Scoping Opinion
7 Sept 2026 Approved 28 Oct 26/01327/PP

Dunfillan 2 Upper Adelaide Street Helensburgh Argyll And Bute G84 7HT

Installation of air source heat pump

Planning Permission
3 Sept 2026 Approved 19 Oct 26/01351/PP

41 Kilbride Road Dunoon Argyll And Bute PA23 7LL

Installation of two heat pumps (for heating and cooling) to rear of dwellinghouse

Planning Permission
2 Sept 2026 Approved 24 Sep 26/01258/PP

Cryo Labs Scottish Asociation For Marine Sciene Dunbeg Argyll And Bute

Installation of 27 roof mounted solar panels.

Planning Permission
27 Aug 2026 Approved 15 Oct 26/01404/PP

Tighnaglaic Crinan Argyll And Bute PA31 8SW

Installation of ground mounted solar panels

Planning Permission
26 Aug 2026 Approved 6 Oct 26/01407/PP

St Conans Church Lochawe Argyll And Bute PA33 1AH

External repairs and installation of new cast iron rainwater pipe, photovoltaic panels on flat roofing and hand rail

Planning Permission
25 Aug 2026 Approved 6 Oct 26/01486/PP

9 Glebefield Road Rhu Argyll And Bute G84 8SZ

Installation of roof mounted photovoltaic panels

Planning Permission
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Argyll

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Argyll?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Argyll. You can also narrow the alert to a postcode, street, or drawn area.

Solar & Renewables applications in nearby councils

We check Argyll's planning portal daily. New solar & renewables applications appear here within a day of being published.