Solar and renewables in Allerdale

Allerdale received 26 renewable energy applications in the last 12 months, including 6 battery storage sites and 4 heat pumps. All 18 decided so far were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received
Get alerts for Allerdale

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 10 of 10 applications
6 Nov 2026 Under Consultation HOU/2026/0153

5 Butterfield Close, Brigham, Cockermouth, CA13 0ZR

Side and rear extension and addition of PV panels

Householder planning permission Allerdale
3 Nov 2026 In Review AGR/2026/0055

Newhall Farm, Sunnyslack, Broughton Moor, Maryport CA15 7RL

Prior notification application for proposed extension of existing building to provide additional space for new biomass boiler and storage of materials

Prior notification Allerdale
3 Nov 2026 Under Consultation FUL/2026/0149

Land at the end of Pittwood Road, Lillyhall, CA14 4JP

The construction and operation of a micro battery storage project.

Full planning permission Allerdale
26 Oct 2026 In Review FUL/2026/0141

Land at Risehow Industrial Estate, Flimby, CA15 8PD

The construction and operation of a micro battery storage project.

Full planning permission Allerdale
26 Oct 2026 Under Consultation FUL/2026/0140

Land at Salisbury Street, Workington, CA14 3TN

The construction and operation of a micro battery storage project.

Full planning permission Allerdale
26 Oct 2026 Under Consultation FUL/2026/0142

Land at Jubilee Road, Lillyhall, CA14 4HB

The construction and operation of a micro battery storage project.

Full planning permission Allerdale
13 Oct 2026 Under Consultation HOU/2026/0140

The Cottage, Gamelsby CA7 0NX

Proposed canopy to front door and solar panels to roof

Householder planning permission Allerdale
11 Sept 2026 Approved HOU/2026/0126

Barn at East Elms Farm, Moor Road, Great Broughton, Cockermouth CA13 0YT

Conversion of redundant barn into a residential annex to the existing farmhouse, including PV Solar Roof Mounted System with velux windows, new doors ...

Householder planning permission Allerdale
27 Aug 2026 Approved FUL/2026/0105

Land to the East of Buildings at Blackdyke, Silloth, Wigton, CA7 4JG

Construction and operation of a Battery Storage Project.

Full planning permission Allerdale
24 Aug 2026 Approved FUL/2026/0116

Greenriggs, Waverton CA7 0AH

Construction of agricultural building to house milking parlour, complete with solar array and concrete apron

Full planning permission Allerdale
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Allerdale

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Allerdale?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Allerdale. You can also narrow the alert to a postcode, street, or drawn area.

We check Allerdale's planning portal daily. New solar & renewables applications appear here within a day of being published.