Lane End Cottage The Town Carsington Derbyshire DE4 4PX Data via plota.co.uk

T/26/00184/TCA Pending

Proposal

Crown reduce 1no. sycamore by 2.5 metres and crown thin by 20% Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2026
✓
Consultation
29 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 30 Oct 2026, from Derbyshire Dales's recent tree and landscaping works.

Comments are open until 20 Oct 2026

Comment on this application ↗

Site constraints 7

4 listed buildings within 150 m of the postcode pin
Nearest: Farmbuildings to South East of Sunnyside, Grade II, about 6 m from the postcode pin · 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Carsington and Hopton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Scheduled monument about 54 m away: Carsington Pasture, Nickalum, Perserverance, West Head, Break Hollow and other small mines and medieval field boundaries
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Priority habitat about 27 m away: Traditional orchard.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Derbyshire Dales - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
DE4 4PX
Received
29 Sept 2026
Validated
29 Sept 2026
Target decision
10 Nov 2026

Decision outlook

Day 10 of the 56-day target. Derbyshire Dales usually decides tree and landscaping works by day 31.

Day 1046 days to the 56-day target
100%decided within 8 weeks
97%approved
146decided in the last year

Plota live figures for tree and landscaping works decided by Derbyshire Dales in the last twelve months, from validation. Derbyshire Dales decision record →

Consultation & key dates

Consultation
29 Sept 2026
Comments by
20 Oct 2026
Statutory expiry
10 Nov 2026
Derbyshire Dales
Planning Authority Score
5.8/10
Average
#110 of 296 councils
Relevant to this application:
Householder decisions

Derbyshire Dales ranks #121 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Derbyshire Dales decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #129 of 296
93%
Householder approved
Above avg (90%) #127 of 296
70%
Decided in 8 weeks
Above avg (63%) #121 of 296
38%
Extended time limit
Below avg (41%) #127 of 296
81%
Minor dwellings approved
85 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
4 decided
486
Total decisions
52 refused in the year to March 2026