Abacus Transport Masters Yard Railway Terrace Kings Langley Hertfordshire WD4 8JA Data via plota.co.uk

26/1771/TPO - Works to trees covered by a Tree Pres O Pending Consideration

Proposal

G1 - 14 Poplars to fell to ground level. There have been around 50 poplars removed from this site due to very poor condition from a heavy Pollard 20 years ago. This row behind the building is also in a poor state and posing serious risk. We have had 2 trees fail in the last 6 month, 1 falling into the building and 1 falling backward into the field. These trees are a huge risk to the public and if they fall into the allotments behind they could cause serious injury Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2026
✓
Validated
9 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Dec 2026 and 13 Dec 2026, from Three Rivers's recent tree and landscaping works.

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Inside the Abbots Langley and Kings Langley built-up area; Priority habitat about 14 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Three Rivers - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to trees covered by a Tree Pres O
Postcode
WD4 8JA
Received
6 Nov 2026
Validated
9 Nov 2026
Ward
Gade Valley
Parish
Abbots Langley Parish Council
Case officer
Show
Target decision
4 Jan 2027
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 14 of the 56-day target. Three Rivers usually decides tree and landscaping works by day 29.

Day 1442 days to the 56-day target
89%decided within 8 weeks
89%approved
448decided in the last year

Plota live figures for tree and landscaping works decided by Three Rivers in the last twelve months, from validation. Three Rivers decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15351849
Planning Portal ref
PP-15351849
Statutory expiry
4 Jan 2027
Env. assessment
No
Three Rivers
Planning Authority Score
7.3/10
Good
#54 of 296 overall
Relevant to this application:
Householder decisions

Three Rivers is faster than most councils at deciding householder applications: #30 of 296 on speed. Only 24% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Three Rivers decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #145 of 296
91%
Householder approved
Above avg (90%) #184 of 296
82%
Decided in 8 weeks
Above avg (63%) #30 of 296
24%
Extended time limit
Below avg (41%) #28 of 296
85%
Minor dwellings approved
62 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
94%
Change of use approved
17 decided
819
Total decisions
86 refused in the year to March 2026