Bleak House 35 Belle Vue Bank Gateshead NE9 6BQ Data via plota.co.uk

DC/26/00880/TREE - Works to Tree in a Conservation Area Awaiting decision

Proposal

Tree works at 35 Belle Vue Bank. Large sycamore tree to be removed and replaced with 1-2 smaller trees. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
Decision
Expected by 17 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 7 Jan 2027 and 16 Jan 2027, from Gateshead's recent tree and landscaping works.

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Low Fell CA conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
3 listed buildings within 150 m of the postcode pin; Radon affected area, class 2; National infrastructure project about 1.6 km away: A1 Birtley to Coal House Improvement Scheme; Inside the Gateshead built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £210,000 in November 2004. Terraced house, freehold.

12 November 2004£210,000
26 January 1996£51,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Gateshead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gateshead
Application type
Works to Tree in a Conservation Area
Postcode
NE9 6BQ
Received
5 Nov 2026
Validated
5 Nov 2026
Ward
Low Fell
Case officer
Show
Target decision
17 Dec 2026
Applicant
Show

Decision outlook

Day 18 of the 56-day target. Gateshead usually decides tree and landscaping works by day 64.

Day 1846 days to the predicted decision (day 64)
27%decided within 8 weeks
97%approved
141decided in the last year

Plota live figures for tree and landscaping works decided by Gateshead in the last twelve months, from validation. Gateshead decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
17 Dec 2026
Env. assessment
No
Gateshead
Planning Authority Score
2.4/10
Poor
#255 of 296 overall
Relevant to this application:
Other decisions

Gateshead is one of the slowest councils in England for householder decisions: #289 of 296 on speed. The council extends the time limit on 67% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Gateshead decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #130 of 296
94%
Householder approved
Above avg (90%) #107 of 296
26%
Decided in 8 weeks
Below avg (63%) #289 of 296
67%
Extended time limit
Above avg (41%) #282 of 296
58%
Minor dwellings approved
24 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
70%
Change of use approved
37 decided
482
Total decisions
54 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.