Hasthorpe Grange Farm Habertoft Lane Habertoft Lincolnshire LN13 9NU Data via plota.co.uk

01521/26/ESR - EIA - Screening Option Awaiting decision

Proposal

Environmental Impact Assessment (E.E.C. Directive .E.C. as amended by Council Directive .C.) for a screening opinion with respect to the erection of a free range egg production unit with associated infrastructure and landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2026
Decision
Expected by 6 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 12 Oct 2026 and 30 Oct 2026, from East Lindsey's recent agricultural works.

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project: Eastern Green Link 3 and Eastern Green Link 4, at pre-application; Priority habitat 29 m away: Coastal and floodplain grazing marsh.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
EIA - Screening Option
Postcode
LN13 9NU
Received
16 Sept 2026
Validated
16 Sept 2026
Ward
Willoughby With Sloothby Ward
Parish
Willoughby With Sloothby
Target decision
6 Oct 2026
Applicant
Show
Agent
Harrison Pick Ltd

Decision outlook

Day 23 of the 56-day target. East Lindsey usually decides agricultural works by day 27.

Day 2333 days to the 56-day target
78%decided within 8 weeks
95%approved
81decided in the last year

Plota live figures for agricultural works decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

Last counted 6 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
6 Oct 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026