The Lynchens 60 High Street Bembridge Isle Of Wight PO35 5SF Data via plota.co.uk

26/01324/TW - Tree Works (Five Day Notice) Approved

Proposal

**5 Day Notice** T1; Ash - Remove. T2; Ash - Remove. T3; Ash - Remove. TG2 2x Oak - Remove. Reason for T1 - T3: Trees are dead or at least 50% dead. Reason for TG2: Trees have failed at the root plate and are supporting each other over boundary fence. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Sept 2026
✓
Approved
21 Sept 2026

Approved on 21 Sept 2026 · Planning Officer Delegated Decision · Last checked 22 Sept 2026

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Priority habitat: No main habitat but additional habitats present
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area 287 m away: Solent & Southampton Water
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 202 m away: Brading Marshes to St. Helen's Ledges SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
2 listed buildings within 150 m; Inside the Bembridge built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 25 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Isle of Wight - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Works (Five Day Notice)
Postcode
PO35 5SF
Received
21 Sept 2026
Validated
21 Sept 2026
Ward
Bembridge
Parish
Bembridge
Case officer
Show
Decision
Granted
Decision date
21 Sept 2026
Decision level
Planning Officer Delegated Decision
Applicant
Show
Agent
Greenscapes Tree Care & Land Management Ltd

How this decision compares

Decided in 0 days from validation, 42 days faster than Isle of Wight's median of 42 for tree and landscaping works. Approved, as 96% of tree and landscaping works here are.

79%decided within 8 weeks
96%approved
301decided in the last year

Plota live figures for tree and landscaping works decided by Isle of Wight in the last twelve months, from validation. Isle of Wight decision record →

Public comments

No public comments yet.

Last counted 22 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Isle of Wight
Planning Authority Score
8.9/10
Excellent
#7 of 296 councils
Relevant to this application:
Householder decisions

Isle of Wight is one of the fastest councils in England for householder decisions, ranking #11 out of 296. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Isle of Wight decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #84 of 296
95%
Householder approved
Above avg (90%) #81 of 296
92%
Decided in 8 weeks
Above avg (63%) #11 of 296
15%
Extended time limit
Below avg (41%) #11 of 296
84%
Minor dwellings approved
144 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
94%
Change of use approved
34 decided
792
Total decisions
63 refused in the year to March 2026