The Shuttle House,New Bridge,Calver, Data via plota.co.uk

NP/DDD/1225/1284 - Listed Building Consent (alter or extend) Approved

Proposal

Listed Building consent - Localised repointing of external gritstone walls where mortar has failed or is missing, including removal of limited areas of inappropriate cement pointing and repointing in matching lime mortar. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 17 Dec 2025
✓
Validated
18 Dec 2025
✓
Approved
11 Feb 2026

Approved on 11 Feb 2026 · Last checked 3 Oct 2026

Site constraints 9

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Public footpath about 10 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Scheduled monument about 5 m away: Calver weir and water management system 200m north east of Stocking Farm
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
1 listed building within 150 m of the postcode pin; Flood defence about 26 m from the postcode pin (engineered high ground); Priority habitat about 24 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area102 m² (1,098 sq ft)
Energy ratingC (72 out of 100), could reach B
PropertySemi-detached house, 4 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in December 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent (alter or extend)
Received
around 17 Dec 2025
Validated
18 Dec 2025
Parish
Calver
Case officer
Show
Decision
GRANTED CONDITIONALLY
Decision date
11 Feb 2026
Applicant
Show

How this decision compares

Decided in 55 days from validation, about the council's usual 56 days. Approved, as 89% of listed building works here are.

53%decided within 8 weeks
89%approved
89decided in the last year

Plota live figures for listed building works decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
18 Dec 2025
Comments by
2 Feb 2026
Statutory expiry
12 Feb 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.