Brackenburn,Riddings Lane,Curbar, Data via plota.co.uk

NP/DDD/1026/0964 - Full Planning Permission REGISTERED: Under Consultation

Proposal

Erection of gateposts and gates Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 2 Oct 2026
Decision
Expected by 27 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Peak District's recent extensions.

Comments are open until 11 Nov 2026

Comment on this application ↗

Documents 14

All documents on the council site ↗

Site constraints 7

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation about 228 m away: South Pennine Moors
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
SSSI about 228 m away: Eastern Peak District Moors SSSI; Scheduled monument about 200 m away: Calver weir and water management system 200m north east of Stocking Farm.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £500,000 in April 2012. Detached house, freehold.

30 April 2012£500,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Peak District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
S32 3YN
Received
around 2 Oct 2026
Validated
2 Oct 2026
Parish
Curbar
Case officer
Show
Applicant
Show

Decision outlook

Day 26 of the 56-day target. Peak District usually decides extensions by day 52.

Day 2630 days to the 56-day target
74%decided within 8 weeks
85%approved
181decided in the last year

Plota live figures for extensions decided by Peak District in the last twelve months, from validation. Peak District decision record →

Consultation & key dates

Consultation
6 Oct 2026
Comments by
11 Nov 2026
Statutory expiry
26 Nov 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.