50 Cannon Street London EC4N 6JJ Data via plota.co.uk

25/01795/ADVT - Advertisement Consent Approved

Proposal

Installation and display of: (i) non-illuminated bronze fascia lettering measuring 400mm x 4320mm x 100mm atop existing entrance canopy at a height of 2.9m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Dec 2025
✓
Validated
23 Dec 2025
✓
Consultation
5 Jan 2026
✓
Approved
29 Oct 2026

Approved on 29 Oct 2026 · Delegated Decision · Last checked 1 Nov 2026

Site constraints 12

Queen Street conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Protected view corridor: 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is. Also in the wider setting of 2A.1 Parliament Hill summit to St Paul's Cathedral; 4A.1 Primrose Hill summit to St Paul's Cathedral; 6A.1 Blackheath Point to St Paul's Cathedral.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 132 m away: Thames Tideway Tunnel
The site is about 132 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 2 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
23 listed buildings within 150 m of the postcode pin
Nearest: Albert Buildings, Grade II, about 26 m from the postcode pin · 4 Grade I, 3 Grade II*, 16 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 23 with distances
Historic England ↗
Scheduled monument about 108 m away: Painter Stainers' Hall
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 34 m away; Town centre about 63 m away: Cheapside.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £30,000,000 in April 2022. Other property, freehold.

28 April 2022£30,000,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement Consent
Postcode
EC4N 6JJ
Received
22 Dec 2025
Validated
23 Dec 2025
Ward
Vintry
Case officer
Show
Target decision
17 Feb 2026
Decision
Approved
Decision date
29 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Lichfields
Leaseholder
Show

How this decision compares

Decided in 310 days from validation, 232 days slower than City of London's median of 78 for signs and adverts. Approved, as 98% of signs and adverts here are.

33%decided within 8 weeks
98%approved
103decided in the last year

Plota live figures for signs and adverts decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

1comment received
1 neutral

Last counted 1 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14433204
Planning Portal ref
PP-14433204
Consultation
5 Jan 2026
Comments by
19 Jan 2026
Committee
29 Oct 2026
Statutory expiry
17 Feb 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Other decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.