Aberfeldy Estate, Phase A, Land to the north of East India Dock Road (A13), east of the Blackwall Tunnel… Data via plota.co.uk

PA/25/02068/S - Non-material amendment (TCPA S96a) Approved

Proposal

Application for Non-Material amendment to planning permission ref: , Dated 03/06/2024 Non Material amendment(s) Sought: Condition 2 (Development in accordance with approved plans and documents) of approved planning application . As such the drawings referred to in Condition 2 should be updated Condition 7- Quantum of development - Detailed Component Condition 26 ? Fire Strategy - Detailed Component Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 1 Dec 2025
✓
Approved
5 Mar 2026

Approved on 5 Mar 2026 · Delegated · Last checked 9 Oct 2026

Documents 84

Plans & drawings 62

PDF AV4A-WAB-BH-ZZ-D-A-221002 REV P02 BLOCK H1 H2 GA ELEVATIONS - WEST ELEVATION Current Plan · 4 Mar 2026 View ↗ PDF Drawing/Document Issue Register Drawing/Document Issue Register · 12 Feb 2026 View ↗ IMG WEST ELEVATION CGI Photo · 12 Feb 2026 View ↗ PDF AV4A-WAB-BH-01-D-A-211001 REV P02 BLOCK H1 H2 H3 GA FIRST FLOOR PLAN Current Plan · 12 Feb 2026 View ↗ PDF AV4A-WAB-BH-02-D-A-211002 REV P02 BLOCK H1 H2 H3 GA SECOND FLOOR PLAN Current Plan · 12 Feb 2026 View ↗ PDF AV4A-WAB-BH-ZZ-D-A-231002 REV P02 BLOCK H1 H2 PROPOSED APARTMENT LAYOUTS 02 Current Plan · 12 Feb 2026 View ↗ IMG WEST ELEVATION Photo · 27 Jan 2026 View ↗ PDF 2B4P-TYPE B APARTMENT 2B4P-TYPE B - LOWER & UPPER LEVEL Current Plan · 27 Jan 2026 View ↗ PDF AV4A-WAB-BF-00-D-A-211000 P01 BLOCK F GA GROUND FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-01-D-A-211001 REV P01 BLOCK F GA FIRST FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-02-D-A-211002 REV P01 BLOCK F GA SECOND FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-07-D-A-211003 REV P01 BLOCK F GA SEVENTH FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-08-D-A-211004 REV P01 BLOCK F GA EIGHTH FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-RF-D-A-211005 REV P01 BLOCK F GA ROOF PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-221001 REV P01 BLOCK F GA NORTH ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-221002 REV P01 BLOCK F GA EAST ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-221003 REV P01 BLOCK F GA SOUTH ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-221004 REV P01 BLOCK F GA WEST ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-221005 REV P01 BLOCK F GA NORTH EAST- NORTH WEST ELEVATIONS Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-226001 REV P01 BLOCK F GA SECTION A-A Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-226002 REV P01 BLOCK F GA SECTION B-B Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-226003 REV P01 BLOCK F GA SECTION C-C Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-231001 REV P01 BLOCK F PROPOSED APARTMENT LAYOUTS 01 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-231002 REV P01 BLOCK F PROPOSED APARTMENT LAYOUTS 02 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-231003 REV P01 BLOCK F PROPOSED APARTMENT LAYOUTS 03 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BF-ZZ-D-A-231004 REV P01 BLOCK F PROPOSED APARTMENT LAYOUTS 04 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-00-D-A-211000 REV P01 BLOCK H1 H2 H3 GA GROUND FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-03-D-A-211003 REV P01 BLOCK H1 H2 H3 GA THIRD FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-04-D-A-211004 REV P01 BLOCK H1 H2 H3 GA FOURTH FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-05-D-A-211005 REV P01 BLOCK H1 H2 H3 GA FIFTH FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-RF-D-A-211006 REV P01 BLOCK H1 H2 H3 GA ROOF PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-ZZ-D-A-221001 REV P01 BLOCK H1 H2 GA EAST ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-ZZ-D-A-221003 REV P01 BLOCK H1 H2 GA NORTH- SOUTH ELEVATIONS Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-ZZ-D-A-226001 REV P01 BLOCK H1 H2 GA SECTION A-A Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-ZZ-D-A-226002 REV P01 BLOCK H1 H2 GA SECTION B-B Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-ZZ-D-A-231001 REV P01 BLOCK H1 H2 PROPOSED APARTMENT LAYOUTS 01 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BH-ZZ-D-A-231003 REV P01 BLOCK H1 H2 PROPOSED APARTMENT LAYOUTS 03 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-221001 REV P01 BLOCK H3 GA WEST ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-221002 REV P01 BLOCK H3 GA EAST ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-221003 REV P01 BLOCK H3 GA NORTH-SOUTH ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-226001 REV P01 BLOCK H3 GA SECTION A-A Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-226002 REV P01 BLOCK H3 GA SECTION B-B Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-231001 REV P01 BLOCK H3 PROPOSED APARTMENT LAYOUTS 01 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-231002 REV P01 BLOCK H3 PROPOSED APARTMENT LAYOUTS 02 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-H3-ZZ-D-A-231003 REV P01 BLOCK H3 PROPOSED APARTMENT LAYOUTS 03 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-00-D-A-211000 REV P01 BLOCK I GA GROUND FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-01-D-A-211001 REV P01 BLOCK I GA FIRST FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-02-D-A-211002 REV P01 BLOCK I GA SECOND FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-06-D-A-211003 REV P01 BLOCK I GA SIXTH FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-07-D-A-211004 REV P01 BLOCK I GA SEVENTH FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-08-D-A-211005 REV P01 BLOCK I GA EIGHTH FLOOR PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-RF-D-A-211006 REV P01 BLOCK I GA ROOF PLAN Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-221001 REV P01 BLOCK I GA NORTH ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-221002 REV P01 BLOCK I GA SOUTH ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-221003 REV P01 BLOCK I GA EAST-WEST ELEVATION Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-226001 REV P01 BLOCK I GA SECTION A-A Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-226002 REV P01 BLOCK I GA SECTION B-B Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-231001 REV P01 BLOCK I PROPOSED APARTMENT LAYOUTS 01 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-231002 REV P01 BLOCK I PROPOSED APARTMENT LAYOUTS 02 Current Plan · 1 Dec 2025 View ↗ PDF AV4A-WAB-BI-ZZ-D-A-231003 REV P01 BLOCK I PROPOSED APARTMENT LAYOUTS 03 Current Plan · 1 Dec 2025 View ↗ PDF 3663-LB-ZZ-00-DR-A-000001 REV 1 SITE LOCATION PLAN Current Plan · 1 Dec 2025 View ↗ PDF Drawing/Document Issue Register Drawing/Document Issue Register · 1 Dec 2025 View ↗

All documents on the council site ↗

Associated applications 14

Site constraints 7

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
National infrastructure project: Lower Thames Crossing
The site is inside the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Norwich to Tilbury (examination closed, recommendation due, about 536 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument about 26 m away: Crop mark complex, Orsett
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2; Heritage at risk about 26 m away: Crop mark complex, Orsett; Priority habitat about 37 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Nearby new applications

4 Nov 2026Pending

Aberfeldy Estate, Phase A, Land to the north of East India Dock Road (A13), east of the Blackwall Tunnel Northern Approach Road (A12) and to the south west of Abbott Road. E14

Application to modify the S106 Agreement dated 03/06/2024, attached to planning ...

PA/26/01894/S
3 Nov 2026Pending

Aberfeldy Estate, Phase A, Land to the north of East India Dock Road (A13), east of the Blackwall Tunnel Northern Approach Road (A12) and to the south west of Abbott Road.

Submission of details pursuant to condition no.47 (Water Efficiency) in relation...

PA/26/01888/S
2 Nov 2026Pending

Aberfeldy Estate, Phase A, Land to the north of East India Dock Road (A13), east of the Blackwall Tunnel Northern Approach Road (A12) and to the south west of Abbott Road.

Submission of Details pursuant to Condition 43 (Managment Plan), of Planning Per...

PA/26/01871/S
28 Oct 2026Pending

Aberfeldy Estate, Phase A, Land to the north of East India Dock Road (A13), east of the Blackwall Tunnel Northern Approach Road (A12) and to the south west of Abbott Road E14

Submission of details pursuant to Condition 35 (Foundation Design) in relation t...

PA/26/01840/NC
28 Oct 2026Pending

Aberfeldy Estate, Phase A, Land to the north of East India Dock Road (A13), east of the Blackwall Tunnel Northern Approach Road (A12) and to the south west of Abbott Road E14

Submission of details pursuant to partial condition no.35 (Foundation Design ) i...

PA/26/01841/S
28 Oct 2026Pending

Aberfeldy Estate, Phase A, Land to the north of East India Dock Road (A13), east of the Blackwall Tunnel Northern Approach Road (A12) and to the south west of Abbott Road E14

Submission of details pursuant to condition no.35 (Foundation Design ) relates t...

PA/26/01842/S

Important details

Application type
Non-material amendment (TCPA S96a)
Received
around 1 Dec 2025
Validated
1 Dec 2025
Ward
Lansbury
Case officer
Show
Target decision
29 Dec 2025
Decision
Permit
Decision date
5 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
DP9 Ltd

How this decision compares

Decided in 94 days from validation, 54 days slower than Tower Hamlets's median of 40 for amendments. Approved, as 92% of amendments here are.

69%decided within 8 weeks
92%approved
170decided in the last year

Plota live figures for amendments decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
29 Dec 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026