Phase 1B, Field Way Greenford Park Central Greenford UB6 8UN Data via plota.co.uk

Approved 253638OUT
Council
Date received
24 Sept 2025
Date validated
24 Sept 2025
Postcode
UB6 8UN

Description

Outline planning application (with all matters reserved) for the demolition of the existing buildings and structures, and the comprehensive redevelopment of the site to deliver new flexible Eg(iii) / B2 / B8 floorspace, with ancillary mezzanine and office floorspace, and associated landscaping, yard, parking, access, and supporting infrastructure works Data via plota.co.uk

Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since late August on its register. Plota adds each one as soon as the council publishes it.

Planning committee

Decided by Ealing Planning Committee on 8 Apr 2026.

Approved unanimously

As officers recommended.

  • Officers advised approval because the scheme would provide modern industrial floorspace and jobs without unacceptable impacts, subject to controls.
  • Members voted unanimously to grant permission subject to a section 106 agreement, conditions and the briefing-note amendments.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, committee questions, vote and decision.

Source: Plota analysis of Ealing's committee minutes of 8 Apr 2026.

Associated applications 14

Site constraints 7

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Local nature reserve 412 m away: Northolt Manor; Conservation area 66 m away: Canalside, northwest part; Inside the Ealing built-up area; Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square; Green belt 63 m away: London.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026