Phase 1B, Field Way Greenford Park Central Greenford UB6 8UN Data via plota.co.uk

264033CND - Discharge Condition Pending Consideration

Proposal

Implementation of Preliminary ecological appraisal pursuant to condition 19 of planning permission ref 253638OUT dated 03/09/2026 for: Outline planning application (with all matters reserved) for the demolition of the existing buildings and structures, and the comprehensive redevelopment of the site to deliver new flexible Eg(iii) / B2 / B8 floorspace, with ancillary mezzanine and office floorspace, and associated landscaping, yard, parking, access, and supporting infrastructure works Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since late August on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
9 Sept 2026
Decision
Target date was 4 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 4 Nov 2026.

Associated applications 14

Site constraints 7

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Local nature reserve 412 m away: Northolt Manor; Conservation area 66 m away: Canalside, northwest part; Inside the Ealing built-up area; Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square; Green belt 63 m away: London.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Discharge Condition
Postcode
UB6 8UN
Received
9 Sept 2026
Validated
9 Sept 2026
Ward
Central Greenford
Case officer
Show
Target decision
4 Nov 2026
Agent
Quod

Public comments

No public comments yet.

Last counted 10 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15189775
Planning Portal ref
PP-15189775
Statutory expiry
4 Nov 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026