Land To North And East Of Bulverton Estate Adjacent To B3176 Station Road Sidmouth EX10 8XW Data via plota.co.uk

26/2284/TRE - Felling/Lopping (TPO) Awaiting decision

Proposal

T2, Holm Oak : Reduce eastern pollarded stem by 2-3m. T3, Holm Oak : Reduce eastern and central stems by 2-3m. T4, Holm Oak : Crown reduce eastern aspect by 2-3m. T5, Holm Oak : Pollard at approximately 4m above ground level. T6, Holm Oak : Reduce tagged stems to main union approximately 3-4m above ground level. T8, Holm Oak : Reduce eastern aspect limb by 2-3m. T9, Holm Oak : Remove snapped limb. T10, Scots Pine : Dismantle to leave an approximate 5-6m stump, ensure finished height is not within falling distance of the highway. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 11 Nov 2026
Decision
Expected by 6 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 21 Dec 2026, from East Devon's recent tree and landscaping works.

Site constraints 7

East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; 1 listed building within 150 m of the postcode pin; Inside the Sidmouth built-up area; Priority habitat about 26 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 12 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Felling/Lopping (TPO)
Postcode
EX10 8XW
Received
around 11 Nov 2026
Validated
11 Nov 2026
Ward
Sidmouth Sidford
Parish
Sidmouth
Applicant
Show
Agent
Dartmoor Tree Surgeons

Decision outlook

Day 7 of the 56-day target. East Devon usually decides tree and landscaping works by day 40.

Day 749 days to the 56-day target
89%decided within 8 weeks
94%approved
380decided in the last year

Plota live figures for tree and landscaping works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

12 neighbours consulted · Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15357084
Planning Portal ref
PP-15357084
Site or press notice
27 Nov 2026
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026