22 Merdon Avenue, Chandler's Ford, Eastleigh, SO53 1EJ Data via plota.co.uk

T/26/102405 - TPO Application Valid - Awaiting Decision

Proposal

1 No. Oak (first oak) - Oak tree along the drive has fungus, oak mazegill, on a branch. We need to remove the branch to reduce further spread of the fungus. Also, reduce the spread by 2-3m to reduce the load on the roots and trunk. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
✓
Validated
3 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 15 Dec 2026, from Eastleigh's recent tree and landscaping works.

Comments are open until 4 Dec 2026

Comment on this application ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
Radon affected area, class 3; Inside the Chandler's Ford built-up area; Priority habitat about 28 m away: Deciduous woodland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastleigh
Application type
TPO
Postcode
SO53 1EJ
Received
2 Nov 2026
Validated
3 Nov 2026
Ward
Hiltingbury Ward
Parish
Chandler's Ford CP
Target decision
29 Dec 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 20 of the 56-day target. Eastleigh usually decides tree and landscaping works by day 42.

Day 2036 days to the 56-day target
97%decided within 8 weeks
92%approved
397decided in the last year

Plota live figures for tree and landscaping works decided by Eastleigh in the last twelve months, from validation. Eastleigh decision record →

Consultation & key dates

Comments by
4 Dec 2026
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 overall
Relevant to this application:
Householder decisions

Eastleigh is faster than most councils at deciding householder applications: #94 of 296 on speed. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026