5 Mount Pleasant Woodford Halse NN11 3RH Data via plota.co.uk

2025/4149/TCA - Works to Trees (Conservation Area) Approved

Proposal

H1 Cotoneaster - Fell and treat stump with eco plugs (broadleaved), T4 Willow - Fell and treat stump with eco plugs (broadleaved), T5 Yew - Fell and treat stump with eco plugs (broadleaved), in order to combat subsidence damage. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2025
✓
Approved
25 Nov 2025

Approved on 25 Nov 2025 · Delegated · Last checked 21 Oct 2026

Site constraints 5

Public footpath about 24 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
6 listed buildings within 150 m of the postcode pin
Nearest: 9 and 11, High Street, Grade II, about 47 m from the postcode pin · 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 6 with distances
Historic England ↗
Also on the record
Radon affected area, class 3; Inside the Woodford Halse built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Northamptonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Trees (Conservation Area)
Postcode
NN11 3RH
Received
14 Oct 2025
Validated
14 Oct 2025
Ward
Woodford & Weedon Ward
Parish
Woodford cum Membris
Target decision
25 Nov 2025
Decision
No Objections
Decision date
25 Nov 2025
Decision level
Delegated
Applicant
Show
Agent
Sedgwick International UK

How this decision compares

Decided in 42 days from validation, about the council's usual 42 days. Approved, as 99% of tree and landscaping works here are.

91%decided within 8 weeks
99%approved
639decided in the last year

Plota live figures for tree and landscaping works decided by West Northamptonshire in the last twelve months, from validation. West Northamptonshire decision record →

Consultation & key dates

Comments by
9 Nov 2025
West Northamptonshire
Planning Authority Score
1.7/10
Poor
#280 of 296 overall
Relevant to this application:
Other decisions

West Northamptonshire is one of the slowest councils in England for householder decisions: #295 of 296 on speed. The council extends the time limit on 79% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
West Northamptonshire decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #123 of 296
93%
Householder approved
Above avg (90%) #144 of 296
18%
Decided in 8 weeks
Below avg (63%) #295 of 296
79%
Extended time limit
Above avg (41%) #295 of 296
81%
Minor dwellings approved
170 decided (1-9 homes)
83%
Major dwellings approved
24 decided (10+ homes)
86%
Change of use approved
207 decided
1,832
Total decisions
179 refused in the year to March 2026