Marston Moreteyne VC School, Church Walk, Marston Moreteyne, Bedford, MK43 0NE Data via plota.co.uk
Proposal
Construction of a new classroom block, a multi-use games area, new fencing, hardstanding play area, air source heat pump and enclosure, a new allotment area, extension to a car park and cycle parking area, reconfiguration of the sports pitch and associated works Data via plota.co.uk
Application progress
Approved on 26 Oct 2026 · Last checked 3 Nov 2026
Associated applications 3
- Construction of a new classroom block, a multi-use games area, new fencing, hardstanding play area, air source heat pump…
Conditions details submitted for 18
Site constraints 4
Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
Marston Moreteyne VC School, Church Walk, Marston Moreteyne, Bedford, MK43 0NE
Discharge of Condition 18 against planning permission ref. CB/26/01150/REG3
Marston Moreteyne VC School, Church Walk, Marston Moreteyne, Bedford, MK43 0NE
Discharge of Biodiversity Gain Plan against planning permission ref. CB/26/01150...
Forest End Lower School, Great Linns, Marston Moreteyne, Bedford, MK43 0DD
Discharge of Condition 21 against planning permission ref. CB/26/01145/REG3
Forest End Lower School, Great Linns, Marston Moreteyne, Bedford, MK43 0DD
Discharge of Biodiversity Gain Plan against planning permission ref CB/26/01145/...
97 Bedford Road, Marston Moreteyne, Bedford, MK43 0LA
Single storey rear extension with lantern rooflight, extension to rear dormer an...
7 Deacon Mews, Marston Moreteyne, Bedford, MK43 0AQ
Lawful Development Certificate Proposed. Loft conversion with rooflights to fron...
Important details
- Council
- Central Bedfordshire
- Application type
- Regulation 3
- Postcode
- MK43 0NE
- Received
- 9 Apr 2026
- Validated
- 29 Apr 2026
- Parish
- Marston Moreteyne
- Case officer
- Show
- Target decision
- 24 Jun 2026
- Decision
- Regulation 3 - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 2 )SuDS Notes 1. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK 2. We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep). Any exceedance should be shown with pathways, depths and velocity. 3. Culverting of existing watercourses will not be permitted. 4. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 5. The connection of private surface water drainage systems to a highway system is not permitted. 6. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 7. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 8. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 9. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 10. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate.SuDS Notes 1. Surface water drainage must follow the SuDS National Standards; National standards for sustainable drainage systems (SuDS) - GOV.UK 2. We will require a full set of calculations for each phase and in total, providing evidence of all surface water retained on site for the 1 in 100 (+40%CC+10% Urban Creep). Any exceedance should be shown with pathways, depths and velocity. 3. Culverting of existing watercourses will not be permitted. 4. Any watercourses (this includes culverted) within or adjacent to the site should be included in the maintenance and management plan, even if there is no discharge to them. This would be a riparian ownership issue but leaving it as such is no longer acceptable. 5. The connection of private surface water drainage systems to a highway system is not permitted. 6. Under Central Bedfordshire Council and IDB bylaws, any watercourse within or adjoining the site boundary will maintain a 9m development free easement (on the development side), unless otherwise agreed with the relevant drainage authority. This applies to all watercourses, where water is present for all or some of the year, including those not clearly stated on mapping, topography or planning documents. 7. Permeable block paving should be laid to CIRIA C768 'Guidance on the construction of SuDS' guidelines. This guidance also stipulates following Interlay guidance. 8. The Council does not, and is not required to, adopt any SuDS feature. It is the responsibility of the applicant to ensure that the surface water drainage system, in its entirety, will be effectively maintained in the long-term. We therefore expect confirmation of the proposed arrangements for maintenance to be provided with the final detailed design, including the future maintenance and operational needs and the responsible bodies for undertaking maintenance (for all public and private drainage components). 9. The final detailed design including proposed standards of operation, construction, structural integrity and ongoing maintenance must be compliant with the 'Non-statutory technical standards for sustainable drainage systems' (March 2015, Ref: PB14308), 'Central Bedfordshire Sustainable Drainage Guidance' (Adopted April 2014, Updated May 2015), and recognised best practise including the Ciria SuDS Manual (2016, C753). 10. Land drainage Consent under the Land Drainage Act 1991 must be secured to discharge surface water to an existing watercourse/ditch, and details of this provided with the full detailed design. An easement should be provided on the developable side of the watercourse to allow for access for maintenance, this should be 9m but may depend on the maintenance requirements considered appropriate. 3 )Highways Notes The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk The applicant is advised that no works associated with the CTMP should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under the Highways Act to be implemented. The applicant is advised that any temporary traffic orders, road or footpath closures, or temporary traffic management works required to facilitate the construction works are subject to separate processes with associated timescales and costs and should not be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. The applicant is advised to contact the Councils Streetworks Team to enable the necessary consent and procedures to be implemented.Highways Notes The applicant is advised that no private surface water drainage system designed as part of a new development, will be allowed to enter any existing highway surface water drainage system. The applicant is advised that the requirements of the New Roads and Street Works Act 1991 will apply to any works undertaken within the limits of the existing public highway. Further details can be obtained by contacting The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 or e-mail: streetworks@centralbedfordshire.gov.uk The applicant is advised that no works associated with the CTMP should be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. Upon receipt of this Notice of Planning Approval, the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301 quoting the Planning Application number. This will enable the necessary consent and procedures under the Highways Act to be implemented. The applicant is advised that any temporary traffic orders, road or footpath closures, or temporary traffic management works required to facilitate the construction works are subject to separate processes with associated timescales and costs and should not be carried out within the confines of the public highway without prior consent, in writing, of the Central Bedfordshire Council. The applicant is advised to contact the Councils Streetworks Team to enable the necessary consent and procedures to be implemented. 4 )Please note that the unnumbered drawings submitted in connection with this application have been given unique numbers by the Local Planning Authority. The numbers can be sourced by examining the plans on the View a Planning Application pages of the Councils website www.centralbedfordshire.gov.uk.Please note that the unnumbered drawings submitted in connection with this application have been given unique numbers by the Local Planning Authority. The numbers can be sourced by examining the plans on the View a Planning Application pages of the Councils website www.centralbedfordshire.gov.uk. 5 )With respect to Condition 22 of this permission, Members of the Development Management Committee expressly required engagement with a Community Reference Group over potential mitigation measures. It is expected that the applicant engages with the Community Reference Group as early as possible to ensure the process has the involvement and input of the Community Group from the outset, that is then reflected in the final scheme for submission to discharge the condition.With respect to Condition 22 of this permission, Members of the Development Management Committee expressly required engagement with a Community Reference Group over potential mitigation measures. It is expected that the applicant engages with the Community Reference Group as early as possible to ensure the process has the involvement and input of the Community Group from the outset, that is then reflected in the final scheme for submission to discharge the condition.
- Decision date
- 26 Oct 2026
- Agent
- Smith Jenkins Planning & Heritage
How this decision compares
Decided in 180 days from validation, 109 days slower than Central Bedfordshire's median of 71 for commercial and major works. Approved, as 78% of commercial and major works here are.
Plota live figures for commercial and major works decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →
Public comments
Last counted 3 Nov 2026
Consultation & key dates
- Consultation
- 29 Apr 2026
- Comments by
- 6 Oct 2026
- Site or press notice
- 29 May 2026
- Committee
- 21 Oct 2026
Historical activity at this location
4 nearby applications on record - archival context, not part of the live application.
Nearby activity
Central Bedfordshire is faster than most councils at deciding householder applications: #62 of 296 on speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).
Track this application
Marston Moreteyne VC School, Church Walk, Marston Moreteyne, Bedford, MK43 0NE
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.