Solar and renewables in Central Bedfordshire

Central Bedfordshire received 67 renewable energy applications in the last 12 months, including 18 heat pumps. Of the 37 decided so far, 33 were approved. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

Date received

Filter applications

Date receivedLast 90 days
Date receivedLast 90 days
Select one year, or two for a range.
Number of homesAny
StatusAny
Application routeAny
Application type1 selected
KeywordsNone
Match

Matches words or phrases in the application address and description.

Showing 19 of 19 applications
17 Nov 2026 Registered CB/26/03424/FULL

The Manor, 2 Salford Road, Aspley Guise, Milton Keynes, MK17 8HZ

Installation of solar panels to side dwelling roof and front barn roof

Full Application Central Bedfordshire
27 Oct 2026 Registered CB/26/03049/FULL

Flitwick Mill House, Greenfield Road, Flitwick, Bedford, MK45 5BE

Replacement garage roof with rear solar panels, air source heat pump and front EV charging point. New chimney pot to existing stack. New water wheel a...

Full Application Central Bedfordshire
23 Oct 2026 Registered CB/26/03236/FULL

26 Langford Road, Henlow, SG16 6AF

Two storey, part single storey, side, and rear extension. Extension to rear dormer, new rooflights and rear and side solar panels. Recladding to dorme...

Full Application Central Bedfordshire
21 Oct 2026 Registered CB/26/03142/FULL

Tyrells End Cottage, Tyrells End, Eversholt, Milton Keynes, MK17 9DS

Installation of air source heat pump, construction of fence and gates

Full Application Central Bedfordshire
16 Oct 2026 Registered CB/26/03050/LB

Flitwick Mill House, Greenfield Road, Flitwick, Bedford, MK45 5BE

Listed Building: Replacement garage roof with rear solar panels, air source heat pump and front EV charging point. New chimney pot to existing stack. ...

Listed Building Central Bedfordshire
9 Oct 2026 Registered CB/26/02973/LB

The Manor, 2 Salford Road, Aspley Guise, Milton Keynes, MK17 8HZ

Listed Building: Installation of photovoltaic panels to the S/E elevation main dwelling roof and to the S/W elevation garage/barn roof

Listed Building Central Bedfordshire
7 Oct 2026 Registered CB/26/03038/PIP

The Old Rectory, The Green, Whipsnade, Dunstable, LU6 2LL

Permission in Principle: For the construction of a self-build dwelling with solar panels and detached car port.

Planning in Principle Central Bedfordshire
2 Oct 2026 Registered CB/26/02880/FULL

Sparrow Hawk, Barton Road, Pulloxhill, Bedford, MK45 5HP

Erection of a detached dwelling, with solar panels and biodiverse roof, associated parking and amenity areas. Demolition of the garage and outbuilding...

Full Application Central Bedfordshire
1 Oct 2026 Registered CB/26/02856/FULL

32A Church End, Everton, Sandy, SG19 2JZ

Installation of air source heat pump to rear elevation

Full Application Central Bedfordshire
1 Oct 2026 Registered CB/26/02350/LB

Tyrells End Cottage, Tyrells End, Eversholt, Milton Keynes, MK17 9DS

Listed Building: Installation of an Air Source Heat Pump and the construction of fencing and gates.

Listed Building Central Bedfordshire
29 Sept 2026 Approved 18 Nov CB/26/02956/FULL

32 Clements End Road, Studham, Dunstable, LU6 2NG

Erection of a single storey rear extension, along with roof mounted solar cells

Full Application Central Bedfordshire
24 Sept 2026 Registered CB/26/02793/REG3

Land adjacent to 107, Hinksley Road, Flitwick, MK45 1HH

Construction of a single storey dwelling, with solar panels to the roof, a new access crossover, on site parking and associated landscaping.

Regulation 3 Central Bedfordshire
23 Sept 2026 Approved 12 Nov CB/26/02835/FULL

Hill House, Beancroft Road, Marston Moreteyne, Bedford, MK43 0QF

Loft conversion with rooflights, front dormer and raised roof ridge. Chimney extension and new hipped roof to rear. Garage conversion including replac...

Full Application Central Bedfordshire
21 Sept 2026 Registered CB/26/02890/FULL

32 Shortmead Street, Biggleswade, SG18 0AP

Demolition of two agricultural buildings. Erection of one agricultural building, part single and part two storey with solar panels on the eastern roof...

Full Application Central Bedfordshire
10 Sept 2026 Approved 11 Nov CB/26/02722/FULL

35 Chestnut Hill, Linslade, Leighton Buzzard, LU7 2TR

Erection of 2 front extensions with open porch and rear extension. Increase roof height to create a first floor with front and rear roof lights. Door ...

Full Application Central Bedfordshire
9 Sept 2026 Approved 11 Nov CB/26/02788/FULL

Abbotsbury, Lynch Hill, Kensworth, Dunstable, LU6 3RD

Conversion of loft and a rear flat roof dormer extension with Juliette balcony, solar panels and rooflights to the front and alterations to external m...

Full Application Central Bedfordshire
27 Aug 2026 Withdrawn 5 Nov CB/26/02196/FULL

Land at Cedar Cottage, 1 Middlefield Lane, Henlow, SG16 6PJ

Erection of a new 4 bed dwelling with solar panels

Full Application Central Bedfordshire
26 Aug 2026 Refused 20 Oct CB/26/01354/FULL

48 Olma Road, Dunstable, LU5 5AF

Erection of a detached bungalow with solar panels to the roof, following demolition of the garage

Full Application Central Bedfordshire
26 Aug 2026 Approved 6 Nov CB/26/02540/FULL

73 Markyate Road, Slip End, Luton, LU1 4BU

Demolition of existing dwelling and 2 outbuildings. Erection of a 4 bedroom replacement dwelling with rear first floor balcony and rear roof solar pan...

Full Application Central Bedfordshire
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Central Bedfordshire

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Central Bedfordshire?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Central Bedfordshire. You can also narrow the alert to a postcode, street, or drawn area.

We check Central Bedfordshire's planning portal daily. New solar & renewables applications appear here within a day of being published.