42 Winchester Street, Botley, Southampton, SO30 2AA Data via plota.co.uk

NC/26/101723 - TPO Approved

Proposal

1no. Spruce - Dismantle to as close to ground level as possible. Causing damage to summer house. Lifting up floor etc. extremely close to summer house and neighbouring fence. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jul 2026
✓
Approved
11 Aug 2026

Approved on 11 Aug 2026 · Delegated Decision · Last checked 12 Sept 2026

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 622 m away: Southampton to London Pipeline Project
The site is about 622 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, about 988 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Botley built-up area; Conservation area about 95 m away: Botley; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £185,000 in September 1997. Detached house, freehold.

30 September 1997£185,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastleigh
Application type
TPO
Postcode
SO30 2AA
Received
7 Jul 2026
Validated
7 Jul 2026
Ward
Botley Ward
Parish
Botley CP
Target decision
18 Aug 2026
Decision
Raise No Objection To
Decision date
11 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
WGS Tree Services (Wesley Skinner)

How this decision compares

Decided in 35 days from validation, 6 days faster than Eastleigh's median of 41 for tree and landscaping works. Approved, as 93% of tree and landscaping works here are.

97%decided within 8 weeks
93%approved
261decided in the last year

Plota live figures for tree and landscaping works decided by Eastleigh in the last twelve months, from validation. Eastleigh decision record →

Consultation & key dates

Comments by
7 Aug 2026
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 councils
Relevant to this application:
Householder decisions

Eastleigh is faster than most councils at deciding householder applications, ranking #94 out of 296. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.