OTH/2026/0876 - Approval of details reserved by a condition Under Consultation

Proposal

Submission of details to comply with conditions 3 (surface water drainage) and 4 (landscaping) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Sept 2026
Decision
Expected by 17 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 17 Nov 2026.

Documents 17

All documents on the council site ↗

Associated applications 3

  • Part of

    FullApprovedcouncil archive

    Conditions 3, 4 awaiting decision · 2 variation sought

Site constraints 9

Special area of conservation about 155 m away: Rochdale Canal
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Conservation area about 5 m away: Castleton (South) Conservation Area
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
SSSI about 155 m away: Rochdale Canal SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Heritage at risk about 5 m away: Castleton (South); Radon affected area, class 2; Coalfield, development low risk area; Inside the Rochdale built-up area; National infrastructure project about 1724 m away: Calderdale Energy Park, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rochdale - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rochdale
Application type
Approval of details reserved by a condition
Postcode
OL11 2QE
Received
22 Sept 2026
Validated
22 Sept 2026
Ward
Castleton
Parish
Rochdale South Township
Case officer
Show
Target decision
17 Nov 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

1comment received
1 neutral

Last counted 1 Oct 2026

Read the comments on the council site ↗

Rochdale
Planning Authority Score
2.4/10
Poor
#259 of 296 councils
Relevant to this application:
Major dwellings

Rochdale is slower than most councils at deciding householder applications, ranking #215 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rochdale decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #176 of 296
88%
Householder approved
Below avg (90%) #221 of 296
54%
Decided in 8 weeks
Below avg (63%) #215 of 296
52%
Extended time limit
Above avg (41%) #237 of 296
81%
Minor dwellings approved
52 decided (1-9 homes)
95%
Major dwellings approved
19 decided (10+ homes)
78%
Change of use approved
60 decided
609
Total decisions
82 refused in the year to March 2026