Tower Wharf, Tower of London and Arches beneath Tower Bridge, Tower Bridge Approach, London, EC3N 4AB Data via plota.co.uk

PA/26/00836/S - Variation/Discharge condition (PLBCA) Approved

Proposal

Application under Section 19 for minor material amendments to Listed Building Consent Ref: , Dated 30/06/2025, which sought consent for: Change of use and refurbishment of the existing Reveller Building to form a Learning Centre to provide enhanced schools and communities facilities in association with the Tower of London (Sui Generis use), conversion and connection of the existing arches of Tower Bridge Approach to provide a dedicated school's entrance to the adjacent Moat, and other associated works. Amendment(s) sought: Reconfiguration of Reveller entrance doors Alterations to doors within Moat Arches Increase in ASHP enclosure footprint Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 May 2026
✓
Approved
18 Aug 2026

Approved on 18 Aug 2026 · Delegated · Last checked 24 Aug 2026

Documents 58

Plans & drawings 53

PDF TOL-PA01-001 SITE LOCATION PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-050 REVELLER DEMOLITION MOAT LEVEL PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-051 A REVELLER DEMOLITION GROUND FLOOR PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-052 A REVELLER DEMOLITION ROOF PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-053 ARCHES DEMOLITION MOAT LEVEL PLAN - NORTH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-060 REVELLER DEMOLITION SECTION AA Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-061 REVELLER DEMOLITION SECTION BB Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-062 REVELLER DEMOLITION SECTION GG Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-063 REVELLER DEMOLITION SECTION HH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-070 REVELLER DEMOLITION NORTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-071 REVELLER DEMOLITION SOUTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-072 REVELLER DEMOLITION WEST ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-080 A REVELLER ROOFLIGHT DEMOLITION SECTION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-081 REVELLER BOX FRAME DEMOLITION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-110 A REVELLER PROPOSED MOAT LEVEL PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-111 A REVELLER PROPOSED GROUND FLOOR PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-112 A REVELLER PROPOSED ROOF PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-113 A ARCHES PROPOSED MOAT LEVEL PLAN - NORTH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-120 A REVELLER PROPOSED SECTION AA Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-121 A REVELLER PROPOSED SECTION BB Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-122 A REVELLER PROPOSED SECTION GG Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-123 A REVELLER PROPOSED SECTION HH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-130 A REVELLER PROPOSED NORTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-131 A REVELLER PROPOSED SOUTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-132 A REVELLER PROPOSED WEST ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-140 A PROPOSED REVELLER ROOFLIGHT DETAIL Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-141 A REVELLER BOX FRAME DETAILS Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-050 A REVELLER DEMOLITION MOAT LEVEL PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-051 B REVELLER DEMOLITION GROUND FLOOR PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-052 B REVELLER DEMOLITION ROOF PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-053 A ARCHES DEMOLITION MOAT LEVEL PLAN - NORTH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-060 A REVELLER DEMOLITION SECTION AA Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-061 A REVELLER DEMOLITION SECTION BB Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-062 A REVELLER DEMOLITION SECTION GG Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-063 A REVELLER DEMOLITION SECTION HH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-070 A REVELLER DEMOLITION NORTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-071 A REVELLER DEMOLITION SOUTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-072 A REVELLER DEMOLITION WEST ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-080 B REVELLER ROOFLIGHT DEMOLITION SECTION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-081 A REVELLER BOX FRAME DEMOLITION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-110 B REVELLER PROPOSED MOAT LEVEL PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-111 B REVELLER PROPOSED GROUND FLOOR PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-112 B REVELLER PROPOSED ROOF PLAN Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-113 B ARCHES PROPOSED MOAT LEVEL PLAN - NORTH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-120 B REVELLER PROPOSED SECTION AA Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-121 B REVELLER PROPOSED SECTION BB Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-122 B REVELLER PROPOSED SECTION GG Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-123 B REVELLER PROPOSED SECTION HH Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-130 B REVELLER PROPOSED NORTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-131 B REVELLER PROPOSED SOUTH ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-132 B REVELLER PROPOSED WEST ELEVATION Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-140 B PROPOSED REVELLER ROOFLIGHT DETAIL Current Plan · 12 May 2026 View ↗ PDF TOL-PA01-141 B REVELLER BOX FRAME DETAILS Current Plan · 12 May 2026 View ↗

All documents on the council site ↗

Associated applications 2

  • Part of

    Listed buildingApprovedcouncil archive
    • VariationApplication under Section 19 for minor material amendments, Dated, which sought consent…This applicationPA/26/00836/S

Site constraints 14

Scheduled monument: Tower of London
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Grade I listed: Tower of London (Inner curtain wall with mural towers, the New Armouries, the King's House and Tower Green)
List entry 1242062 · The pin is inside its outline · 15 more listed buildings within 150 m (6 Grade I, 2 Grade II*, 6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 15 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
World heritage site: Tower of London
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
The Tower conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Protected view corridor: 25A.1 City Hall to the White Tower
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 945 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 1.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Flood defence 42 m away (wall, designed for a 1 in 1000 year flood); Priority habitat 43 m away: Mudflats.
Not affected
Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area396 m² (4,263 sq ft)
Energy ratingA (asset rating 24)
UseGeneral Assembly and Leisure, Night Clubs, and Theatres
HeatingAir Conditioning

From the energy performance certificate lodged in March 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Variation/Discharge condition (PLBCA)
Postcode
EC3N 4AB
Received
12 May 2026
Validated
12 May 2026
Ward
St Katharines and Wapping
Case officer
Show
Target decision
17 Aug 2026
Decision
Permit
Decision date
18 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
The Planning Lab

Consultation & key dates

Site or press notice
11 Jun 2026
Statutory expiry
7 Jul 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Change of use

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.