Beechcroft & Orta House, Ermin Street, Baydon, Marlborough, SN8 2JP Data via plota.co.uk

PL/2025/06666 - Consent under Tree Preservation Orders Approved

Proposal

T1 Beech tree - Side and through prune where needed and to crown raise by 1m to give a 3m clearance from the ground to gain area safety clearance from the electric network. The crown raise on T1 is to clear a single cable and to allow access to customers garage. This will be done by thinning the lower limbs to remove some weight. T2 Beech tree - Through prune where needed to gain area safety clearance from the electric network. All cutting to gain a safety clearance of 1m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 14 Aug 2025
✓
Approved
23 Sept 2025

Approved on 23 Sept 2025 · Last checked 16 Oct 2026

Site constraints 5

North Wessex Downs National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Conservation area about 14 m away: Baydon
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Inside the Baydon built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wiltshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wiltshire
Application type
Consent under Tree Preservation Orders
Postcode
SN8 2JP
Received
around 14 Aug 2025
Validated
14 Aug 2025
Ward
Aldbourne & Ramsbury
Parish
Baydon CP
Case officer
Show
Target decision
23 Sept 2025
Decision
Approve with Conditions
Decision date
23 Sept 2025

How this decision compares

Decided in 40 days from validation, about the council's usual 39 days. Approved, as 99% of tree and landscaping works here are.

95%decided within 8 weeks
99%approved
1,839decided in the last year

Plota live figures for tree and landscaping works decided by Wiltshire in the last twelve months, from validation. Wiltshire decision record →

Public comments

1comment received
1 supporting

Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
5 Sept 2025
Wiltshire
Planning Authority Score
3.9/10
Below average
#203 of 296 overall
Relevant to this application:
Householder decisions

Wiltshire is slower than most councils at deciding householder applications: #225 of 296 on speed. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wiltshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #71 of 296
96%
Householder approved
Above avg (90%) #65 of 296
53%
Decided in 8 weeks
Below avg (63%) #225 of 296
55%
Extended time limit
Above avg (41%) #252 of 296
78%
Minor dwellings approved
339 decided (1-9 homes)
90%
Major dwellings approved
48 decided (10+ homes)
92%
Change of use approved
160 decided
3,659
Total decisions
256 refused in the year to March 2026