25 & 26 Shore Road Poole BH13 7PJ Data via plota.co.uk

P/25/03665/TTPO - Tree work to tree/s subject to a TPO Decided

Proposal

T1 -Holm Oak _Reduce Crown by 2m - rear garden -(tree owned by 25 Shore Rd) T2 - Holm Oak -reduce branches by 2m T3 - Holm Oak - " " " " T4 -Beech Tree - Reduce over extended limbs growing over drive & touching windows of No. 25 (owned by 26 Shore Rd) Holm Oak - Reduce branches encroaching over property & touching windows of No. 25 owned by 26 Shore Road New Proposal for T2, T3 and T4: T2 Holm Oak, reduce lateral branches on the north side of the canopy that are growing/encroaching towards the property of No.25 by 2m. T3 Holm Oak, reduce lateral branches on the north side of the canopy that are growing/encroaching towards the property and over the driveway of No.25 by 2m. T4 Beech, reduce lateral branches on the north side of the canopy that are growing/encroaching towards the property and over the driveway of No.25 by 2m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Sept 2025
✓
Validated
23 Sept 2025
✓
Split decision
26 Nov 2025

Split decision on 26 Nov 2025 · Delegated · Last checked 13 Oct 2026

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Ramsar wetland about 64 m away: Poole Harbour
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI about 64 m away: Poole Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Wild Purbeck; Inside the Poole built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Tree work to tree/s subject to a TPO
Postcode
BH13 7PJ
Received
17 Sept 2025
Validated
23 Sept 2025
Ward
Canford Cliffs
Case officer
Show
Decision
Split decision
Decision date
26 Nov 2025
Decision level
Delegated
Applicant
Show
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 overall
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications: #256 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026