Nether Hall Farm Hallmoor Road Darley Dale Derbyshire DE4 2QQ Data via plota.co.uk

25/01161/OUT - Outline Planning Permission Approved

Proposal

Outline application for the demolition of existing annex and stable block and the erection of 1 no. dwellinghouse with approval being sought for access Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Dec 2025
✓
Consultation
15 Sept 2026
✓
Approved
15 Oct 2026

Approved on 15 Oct 2026 · Committee · Last checked 17 Oct 2026

Planning committee

Decided by Derbyshire Dales Planning Committee on 13 Oct 2026.

Approved

As officers recommended.

  • Officers advised approval because the dwelling was acceptable in principle and its impacts could be controlled by conditions.
  • Residents raised concerns about overdevelopment, privacy, parking, drainage, settlement boundaries and earlier refusals; others supported the proposal.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, objections, public speakers, committee debate and decision.

Source: Plota analysis of Derbyshire Dales's committee minutes of 13 Oct 2026.

Site constraints 4

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Darley Dale built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Derbyshire Dales - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline Planning Permission
Postcode
DE4 2QQ
Received
12 Dec 2025
Validated
12 Dec 2025
Ward
Darley Dale
Parish
Darley Dale
Case officer
Show
Target decision
16 Oct 2026
Decision
Granted with Conditions
Decision date
15 Oct 2026
Decision level
Committee
Applicant
Show
Agent
GRT Architecture

How this decision compares

Decided in 307 days from validation, 230 days slower than Derbyshire Dales's median of 77 for outline applications. Approved, as 62% of outline applications here are.

31%decided within 8 weeks
62%approved
38%go to committee

Plota live figures for outline applications decided by Derbyshire Dales in the last twelve months, from validation. Derbyshire Dales decision record →

Consultation & key dates

Alt. reference
PP-14554282
Planning Portal ref
PP-14554282
Neighbours
5 Oct 2026
Consultation
15 Sept 2026
Comments by
6 Oct 2026
Site or press notice
8 Jan 2026
Committee
13 Oct 2026
Statutory expiry
6 Feb 2026
Env. assessment
No
Derbyshire Dales
Planning Authority Score
5.8/10
Average
#110 of 296 councils
Relevant to this application:
Major dwellings

Derbyshire Dales ranks #121 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Derbyshire Dales decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #129 of 296
93%
Householder approved
Above avg (90%) #127 of 296
70%
Decided in 8 weeks
Above avg (63%) #121 of 296
38%
Extended time limit
Below avg (41%) #127 of 296
81%
Minor dwellings approved
85 decided (1-9 homes)
75%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
4 decided
486
Total decisions
52 refused in the year to March 2026