Carpenters Primary School Friendship Way Stratford London E15 2JQ Data via plota.co.uk

25/02425/LA3 - Local Authority Regulation 3 Application Approved at committee

Approved at planning committee on 14 July 2026, subject to a legal agreement. The council issues its decision notice once the agreement is signed.

Proposal

Phased demolition of existing buildings and redevelopment to provide a new primary school (Class F1), residential building (Class C3) with commercial use (Class E) at ground floor, flexible community and school use sports facilities (Class F1/F2), and associated landscaping, amenity space, access arrangements, parking and infrastructure. (Re-Consultation) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 27 Oct 2025
✓
Committee
14 Jul 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 387.

Planning committee

Decided by Newham Strategic Development Committee on 14 Jul 2026. The council has not yet issued its decision notice.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • The applicant's team said the scheme would deliver a modern replacement primary school and about 120 homes, with community benefits secured through planning obligations.
  • The headteacher said the existing school was no longer fit for modern teaching, and the new design followed close collaboration with the school community.
  • A neighbour objected over the lack of affordable housing and evening noise from sports facilities, asking for refusal or deferral, but the committee resolved to approve.
Read how the committee decided The school's case for rebuilding, a neighbour's objections on housing and noise, and the committee's decision to approve.

Source: Plota analysis of Newham's committee minutes of 14 Jul 2026.

Documents 182

Statements & assessments 49

PDF WHOLE LIFECYCLE CARBON ASSESSMENT REV P03 Revised Documentation · 12 Mar 2026 View ↗ PDF WIND MICROCLIMATE ASSESSMENT REV PO2 Revised Documentation · 12 Mar 2026 View ↗ PDF BNG HABITAT GAIN PLAN REV A Revised Documentation · 12 Mar 2026 View ↗ PDF BNG HABITAT BASELINE ASSESSMENT REV A Revised Documentation · 12 Mar 2026 View ↗ PDF EXTERNAL LIGHTING ASSESSMENT REV P02 Revised Documentation · 12 Mar 2026 View ↗ PDF ENERGY STRATEGY REV P05 Revised Documentation · 12 Mar 2026 View ↗ PDF HABITATS REGULATIONS SCREENING ASSESSMENT REPORT OCTOBER 2025 Application Form · 12 Mar 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL FEBRUARY 2026 Revised Documentation · 12 Mar 2026 View ↗ PDF BREEAM PRE-ASSESSMENT Revised Documentation · 12 Mar 2026 View ↗ PDF TRANSPORT FOR LONDON Consultee Comment · 24 Dec 2025 View ↗ PDF CARPENTERS PRIMARY SCHOOL STAGE 1 GLA ENERGY MEMO Documentation · 22 Dec 2025 View ↗ PDF UPDATED EXTERNAL LIGHTING ASSESSMENT Documentation · 18 Dec 2025 View ↗ PDF LBN TRANSPORT COMMENTS 10-DEC-2025 Consultee Comment · 10 Dec 2025 View ↗ PDF AIR QUALITY ASSESSMENT Documentation · 27 Oct 2025 View ↗ PDF BIODIVERSITY NET GAIN ASSESSMENT Documentation · 27 Oct 2025 View ↗ PDF DRAINAGE AND SUDS STRATEGY PART 1 OF 2 Documentation · 27 Oct 2025 View ↗ PDF DRAINAGE AND SUDS STRATEGY PART 2 OF 2 Documentation · 27 Oct 2025 View ↗ PDF PROPOSED DRAINAGE STRATEGY -CPS-CUR-XX-XX-D-C-920001_VER2 Documentation · 27 Oct 2025 View ↗ PDF ECOLOGICAL APPRAISAL Documentation · 27 Oct 2025 View ↗ PDF CIRCULAR ECONOMY STATEMENT- PART 1 OF 3 Documentation · 27 Oct 2025 View ↗ PDF CIRCULAR ECONOMY STATEMENT- PART 2 OF 3 Documentation · 27 Oct 2025 View ↗ PDF CIRCULAR ECONOMY STATEMENT- PART 3 OF 3 Documentation · 27 Oct 2025 View ↗ PDF ENERGY STRATEGY- CPS-HLE-XX-XX-TRP-ME-000023_VER4 Documentation · 27 Oct 2025 View ↗ PDF SUSTAINABILITY STATEMENT- CPS-HLE-XX-XX-TRP-ME-000019_VER3 Documentation · 27 Oct 2025 View ↗ PDF WLC ASSESSMENT CPS-HLE-XX-XX-TRP-ME-000022_VER2 Documentation · 27 Oct 2025 View ↗ PDF 1923784-HLE-RP-FE-CPS LONDON PLAN PLANNING STATEMENT-REV01 Documentation · 27 Oct 2025 View ↗ PDF 1923784-HLE-RP-FE-CPS RESI LONDON PLAN PLANNING STATEMENT-REV01 Documentation · 27 Oct 2025 View ↗ PDF FINANCIAL VIABILITY ASSESSMENT Documentation · 27 Oct 2025 View ↗ PDF SV HEALTH IMPACT ASSESSMENT Documentation · 27 Oct 2025 View ↗ PDF EXTERNAL LIGHTING ASSESSMENT Documentation · 27 Oct 2025 View ↗ PDF 1015645-HLE-RP-AC-ENVIRONMENTAL NOISE SURVEY Documentation · 27 Oct 2025 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Documentation · 27 Oct 2025 View ↗ PDF 86302-CUR-00-XX-T-TP-00001-P03_HEALTHY STREETS TRANSPORT ASSESMENT Documentation · 27 Oct 2025 View ↗ PDF ARBORICULTURAL REPORT AND METHOD STATEMENT Documentation · 27 Oct 2025 View ↗ PDF TREE SURVEY Documentation · 27 Oct 2025 View ↗ PDF REP-0710742-TK-20250728-VENTILATION STATEMENT-R00 Documentation · 27 Oct 2025 View ↗ PDF WIND MICROCLIMATE ASSESSMENT Documentation · 27 Oct 2025 View ↗ PDF PLANNING STATEMENT Documentation · 27 Oct 2025 View ↗ PDF 1_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF 2_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF 3_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF 4_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF 5_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF 6_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF 7_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF 8_CPS-MLA-WS-XX-TRP-A-DESIGN AND ACCESS STATEMENT_VER8 Documentation · 27 Oct 2025 View ↗ PDF LPG_-_WLCA_ASSESSMENT_TEMPLATE_PLANNING- CPS Documentation · 27 Oct 2025 View ↗ PDF BNG METRIC Documentation · 27 Oct 2025 View ↗ PDF NOISE REPORT ADDENDUM 26 MARCH 2026 Documentation · 1 Jan 1900 View ↗

Plans & drawings 79

PDF OUTLINE SITE WASTE MANAGEMENT PLAN VERSION 1.2 MARCH 2026 Revised Documentation · 12 Mar 2026 View ↗ PDF OUTLINE DEMOLITION MANAGEMENT PLAN Documentation · 27 Oct 2025 View ↗ PDF VIABILITY APPRAISAL COSTS PLAN Documentation · 27 Oct 2025 View ↗ PDF 86302-CUR-00-XX-T-TP-00002-P02_TRAVEL PLAN Documentation · 27 Oct 2025 View ↗ PDF 86302-CUR-00-XX-T-TP-00003-P02_DELIVERY AND SERVICING MANAGEMENT PLAN Documentation · 27 Oct 2025 View ↗ PDF TREE CONSTRAINTS PLAN Documentation · 27 Oct 2025 View ↗ PDF PROPOSED LANDSCAPE AND BOUNDARY ELEVATION A Drawing · 27 Oct 2025 View ↗ PDF PROPOSED LANDSCAPE AND BOUNDARY SECTION B Drawing · 27 Oct 2025 View ↗ PDF PROPOSED LANDSCAPE AND BOUNDARY SECTION C Drawing · 27 Oct 2025 View ↗ PDF PROPOSED LANDSCAPE AND BOUNDARY SECTION D Drawing · 27 Oct 2025 View ↗ PDF PROPOSED LANDSCAPE AND BOUNDARY SECTION E Drawing · 27 Oct 2025 View ↗ PDF SATELLITE BUILDING KEY DRAWINGS Revised Drawing · 27 Oct 2025 View ↗ PDF DEMOLITION PLAN Revised Drawing · 27 Oct 2025 View ↗ PDF EXISTING SITE LOCATION PLAN Drawing · 27 Oct 2025 View ↗ PDF EXISTING SITE PLAN - LEVEL 00 Drawing · 27 Oct 2025 View ↗ PDF EXISTING SITE PLAN - LEVEL 01 Drawing · 27 Oct 2025 View ↗ PDF PROPOSED LANDSCAPE PLANP05 Drawing · 27 Oct 2025 View ↗ PDF PROPOSED SITE ELEVATIONS - A AND B Drawing · 27 Oct 2025 View ↗ PDF PROPOSED SITE ELEVATIONS - C Drawing · 27 Oct 2025 View ↗ PDF PROPOSED SITE PLAN Drawing · 27 Oct 2025 View ↗ PDF CONTEXT PLAN Revised Drawing · 27 Oct 2025 View ↗ PDF DEMOLITION ELEVATIONS 01-04 Revised Drawing · 27 Oct 2025 View ↗ PDF DEMOLITION ELEVATIONS 05-06 Revised Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED 1-BED UNIT PLAN Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED 2-BED UNIT PLAN - TYPE 2 Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED 2-BED UNIT PLAN Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED 3-BED UNIT PLAN Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED GA PLAN - LEVEL 00 Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED GA PLAN - LEVEL 01 AND LEVEL 02 Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED GA PLAN - LEVEL 03 TO LEVEL 10 Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED GA PLAN - ROOF PLAN Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED SECTION AA Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED SECTION BB Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED SOUTH ELEVATION Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED WEST ELEVATION Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED WHEELCHAIR UNIT PLAN - TYPE 01 Documentation · 27 Oct 2025 View ↗ PDF RESI PROPOSED WHEELCHAIR UNIT PLAN - TYPE 02 Documentation · 27 Oct 2025 View ↗ PDF RESI PROPOSED EAST ELEVATION Drawing · 27 Oct 2025 View ↗ PDF RESI PROPOSED NORTH ELEVATION Drawing · 27 Oct 2025 View ↗ PDF RESI BAY STUDY - NORTH ELEVATION GROUND FLOOR Drawing · 27 Oct 2025 View ↗ PDF RESI BAY STUDY - SIDE ELEVATION GROUND FLOOR Drawing · 27 Oct 2025 View ↗ PDF RESI BAY STUDY - SIDE ELEVATION UPPER LEVEL Drawing · 27 Oct 2025 View ↗ PDF RESI BAY STUDY - SOUTH ELEVATION GROUND FLOOR Drawing · 27 Oct 2025 View ↗ PDF RESI BAY STUDY - SOUTH ELEVATION UPPER LEVEL Drawing · 27 Oct 2025 View ↗ PDF RESI BAY STUDY - WEST ELEVATION GROUND FLOOR Drawing · 27 Oct 2025 View ↗ PDF RESI BAY STUDY - WEST ELEVATION UPPER LEVEL Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS - BLOCK 1 AND 2 - LEVEL 01 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS - BLOCK 1 AND 2 - LEVEL 02 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS - BLOCK 3 - LEVEL 01 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS - BLOCK 3 - ROOF) Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS - LEVEL 00 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS - LEVEL 01 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS - LEVEL 02 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS B 1 AND 2 L00 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLANS BLOCK 3 LEVEL 00 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA SECTION - BLOCK 1 AND 2 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA SECTION - BLOCK 2 AND 3 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA SOUTH ELEVATION Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA WEST ELEVATION Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED SITE ELEVATIONS Drawing · 27 Oct 2025 View ↗ PDF SCHOOLPROPOSED GA PLANS - BLOCK 1 AND 2 - ROOF Documentation · 27 Oct 2025 View ↗ PDF SCHOOL BAY STUDY - ENTRANCE BENCH Drawing · 27 Oct 2025 View ↗ PDF SCHOOL BAY STUDY - MAIN HALL Drawing · 27 Oct 2025 View ↗ PDF SCHOOL BAY STUDY - SCHOOL ENTRANCE Drawing · 27 Oct 2025 View ↗ PDF SCHOOL BAY STUDY - TEACHING BLOCK Drawing · 27 Oct 2025 View ↗ PDF SCHOOL EXISTING SCHOOL ELEVATIONS 01-04 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL EXISTING SCHOOL ELEVATIONS 05-06 Drawing · 27 Oct 2025 View ↗ PDF SCHOOL EXISTING SCHOOL GA PLAN Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED FIRE STRATEGY PLAN - ROOF PLAN Documentation · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED FIRE STRATEGY PLAN L01 Documentation · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED FIRE STRATEGY PLAN L02 Documentation · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED FIRE STRATEGY PLAN Documentation · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA EAST ELEVATION Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA ELEVATION Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA NORTH ELEVATION Drawing · 27 Oct 2025 View ↗ PDF SCHOOL PROPOSED GA PLAN - ROOF Drawing · 27 Oct 2025 View ↗ PDF DEMOLITION ELEVATIONS Drawing · 27 Oct 2025 View ↗ PDF EXISTING CARETAKERS ELEVATIONS Drawing · 27 Oct 2025 View ↗ PDF EXISTING SITE PLAN Drawing · 27 Oct 2025 View ↗

Other documents 36

PDF LETTER OF SUPPORT Correspondence · 17 Jun 2026 View ↗ PDF PRE DEMOLITION AUDIT VERSION 1.2 Revised Documentation · 12 Mar 2026 View ↗ PDF DAYLIGHT SUNLIGHT REPORT REV 03 Revised Documentation · 12 Mar 2026 View ↗ PDF DAYLIGHT AND SUNLIGHT ADDENDUM - UPDATED Revised Documentation · 3 Mar 2026 View ↗ PDF DAYLIGHT, SUNLIGHT AND OVERSHADOWING ADDENDUM Revised Documentation · 10 Feb 2026 View ↗ PDF DAYLIGHT, SUNLIGHT OVERSHADOWING ADDENDUM APPENDIX A Revised Documentation · 10 Feb 2026 View ↗ PDF CARPENTERS PRIMARY SCHOOL GLA STAGE 1 REPORT Documentation · 22 Dec 2025 View ↗ PDF CARPENTERS PRIMARY SCHOOL GLA STAGE 1 LETTER Documentation · 22 Dec 2025 View ↗ PDF CARPENTERS PRIMARY SCHOOL_GLA WLC MEMO Documentation · 22 Dec 2025 View ↗ PDF CARPENTERS PRIMARY SCHOOL_GLA CE MEMO_STAGE 1 Documentation · 22 Dec 2025 View ↗ PDF 220823_GLA SLEEVING NOTE Documentation · 22 Dec 2025 View ↗ PDF ARCHAEOLOGICAL DBA Documentation · 27 Oct 2025 View ↗ PDF COMMERCIAL MARKETING STRATEGY Documentation · 27 Oct 2025 View ↗ PDF DAYLIGHT AND SUNLIGHT REPORT Documentation · 27 Oct 2025 View ↗ PDF BREEAM 5525779-HLE-XX-XX-RP-ST-354010 Documentation · 27 Oct 2025 View ↗ PDF OVERHEATING CPS-HLE-XX-XX-TRP-ME-000026_VER3 Documentation · 27 Oct 2025 View ↗ PDF OVERHEATING- CPS-HLE-XX-XX-TRP-ME-000027_VER4 Documentation · 27 Oct 2025 View ↗ PDF CPS-PDB-XX-XX-TDN-K-250919 EQIA Documentation · 27 Oct 2025 View ↗ PDF 1923784-HLE-RP-FE-CPS GATEWAY ONE-REV01 Documentation · 27 Oct 2025 View ↗ PDF FRA PART 1 OF 2 Documentation · 27 Oct 2025 View ↗ PDF FRA PART 2 OF 2 Documentation · 27 Oct 2025 View ↗ PDF PHASE 1 PRA- PART 1 OF 2 Documentation · 27 Oct 2025 View ↗ PDF PHASE 1 PRA- PART 2 OF 2 Documentation · 27 Oct 2025 View ↗ PDF 86302-CUR-00-XX-T-TP-00006-P02_CPMP Documentation · 27 Oct 2025 View ↗ PDF 86302-CUR-00-XX-T-TP-00004-P03_OUTLINE CLP Documentation · 27 Oct 2025 View ↗ PDF 86302-CUR-00-XX-T-TP-00005-P02_OSWMP Documentation · 27 Oct 2025 View ↗ PDF PRE REDEVELOPMENT AUDIT Documentation · 27 Oct 2025 View ↗ PDF OUTLINE SWMP Documentation · 27 Oct 2025 View ↗ PDF PRE DEMOLITION AUDIT Documentation · 27 Oct 2025 View ↗ PDF RESIDENTIAL ACCOMMODATION SCHEDULE Documentation · 27 Oct 2025 View ↗ PDF RESI PROPOSED FIRE STRATEGY (LEVEL 01 - LEVEL 10 Documentation · 27 Oct 2025 View ↗ PDF RESI PROPOSED FIRE STRATEGY - LEVEL 00 Documentation · 27 Oct 2025 View ↗ PDF PART_L_2021_GLA_CARBON_EMISSION_REPORTING_SPREADSHEET Documentation · 27 Oct 2025 View ↗ PDF PART_L_2021_GLA_CARBON_EMISSION_REPORTING_SPREADSHEET Documentation · 27 Oct 2025 View ↗ PDF GLA_CIRCULAR_ECONOMY_STATEMENTS_TEMPLATE_CARPENTERS Documentation · 27 Oct 2025 View ↗ PDF COPY OF 250310_1097_DRAFT_RESIDENTIAL_BR_TRACKER Documentation · 27 Oct 2025 View ↗

All documents on the council site ↗

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Designated open space
Borough-designated open space.
Loss of protected open space is resisted unless it is replaced by space of equal or better quality nearby.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 170 m away: Thames Tideway Tunnel
The site is 170 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Inside the Newham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Local Authority Regulation 3 Application
Postcode
E15 2JQ
Received
around 27 Oct 2025
Validated
27 Oct 2025
Ward
Stratford
Parish
Stratford Community Forum
Case officer
Show
Applicant
Show
Agent
Turley

Decision outlook

Day 387, past the statutory target. 87% of full applications in Newham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 387331 days past the 56-day target
66%decided within 8 weeks
77%approved
587decided in the last year

Plota live figures for full applications decided by Newham in the last twelve months, from validation. Newham decision record →

Public comments

7comments received
4 objecting3 neutral

57% object · below the UK average of 74%

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026