James Riley Point Carpenters Road Stratford London E15 2HZ Data via plota.co.uk

25/02707/NONMAT - Non Material Change Pending

Proposal

Non-material amendment to planning permission /FUL_LLDC dated 13th April 2023, to vary Condition 2 (Approved Plans) to make improvements to the design of the community centre, external landscaping and car parking area. The application also seeks permission to amend the description of development to: Full planning application for the refurbishment of the existing 23 storey James Riley Point tower block to provide 136 residential units (Class C3) through refurbishment and alteration of internal arrangements of existing units and new façade including the addition of new balconies and roof parapet walls. Extension of the ground floor to provide new access arrangements and new one-storey building plus basement to provide a relocated community facility (Use Class E), public realm and landscaping improvements including alteration to parking arrangements, new tree planting, environmental improvements and associated infrastructure. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 27 Nov 2025
Decision
Target date was 22 Jan 2026

Under consideration

No decision has been issued yet. A decision is expected by 22 Jan 2026.

Documents 57

Plans & drawings 34

PDF CER1A-LDA-X0-00-DR-L-000101 GF GA Drawing · 27 Nov 2025 View ↗ PDF CER1A-LDA-X0-00-DR-L-000201 GF HARDWORKS PLAN Drawing · 27 Nov 2025 View ↗ PDF CER1A-LDA-X0-00-DR-L-000301 GF SOFTWORKS PLAN Drawing · 27 Nov 2025 View ↗ PDF CER1A-LDA-X0-00-DR-L-000700 SECTION 01 Drawing · 27 Nov 2025 View ↗ PDF CER1A-LDA-X0-00-DR-L-000701 SECTION 02 Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-01-DR-A-306101-PROPOSED GENERAL ARRANGEMENT - FIRST FLOOR Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-01-DR-A-307104-PROPOSED GEA PLANS - GROUND FLOOR - GRADE Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-01-DR-A-307106-PROPOSED GEA PLANS - LOWER GROUND FLOOR Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-01-DR-A-307107-PROPOSED GEA PLANS - FIRST FLOOR Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-01-DR-A-307112-PROPOSED GIA PLANS - GROUND FLOOR - GRADE Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-01-DR-A-307113-PROPOSED GIA PLANS - LOWER GROUND FLOOR Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-01-DR-A-307114-PROPOSED GIA PLANS - FIRST FLOOR Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306211-PROPOSED GENERAL ARRANGEMENT - SECTION AA Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306212-PROPOSED GENERAL ARRANGEMENT - SECTION BB Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306213-PROPOSED GENERAL ARRANGEMENT - SECTION CC Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306214-PROPOSED GENERAL ARRANGEMENT - SECTION DD Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306310-PROPOSED GENERAL ARRANGEMENT - NORTH ELEVATION Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306311-PROPOSED GENERAL ARRANGEMENT - WEST ELEVATION Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306312-PROPOSED GENERAL ARRANGEMENT - EAST ELEVATION Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X0-ZZ-DR-A-306313-PROPOSED GENERAL ARRANGEMENT - SOUTH ELEVATION Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-00-DR-A-306100-PROPOSED GENERAL ARRANGEMENT PLANS - GROUND FLOOR - GR Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-B1-DR-A-306099-PROPOSED GENERAL ARRANGEMENT PLANS - LOWER GROUND FLOO Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-XX-DR-A-307110-PROPOSED RESIDENTIAL GEA AREA PLANS Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-XX-DR-A-307115-PROPOSED RESIDENTIAL NSA AREA PLANS Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-306501-BAY STUDY - SPORTS HALL Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-306502-BAY STUDY - COURTYARD ELEVATION Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-306503-BAY STUDY - RESIDENTIAL ENTRANCE Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-306504-BAY STUDY - NURSERY ENTRANCE Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-306505-BAY STUDY - NORTH ENTRANCE Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-306506-BAY STUDY - CAFE Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-306507-BAY STUDY - FOOD BANK Drawing · 27 Nov 2025 View ↗ PDF CER1A-LDA-X0-00-DR-L-000100 ILLUSTRATIVE MASTERPLAN Drawing · 27 Nov 2025 View ↗ PDF CER1A-LDA-X0-RF-DR-L-000102 RF GA Drawing · 27 Nov 2025 View ↗ PDF JRP-ECD-X1-ZZ-DR-A-302001-PROPOSED SITE PLAN Drawing · 27 Nov 2025 View ↗

All documents on the council site ↗

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 218 m away: Thames Tideway Tunnel
The site is 218 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Newham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 35 m away.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Non Material Change
Postcode
E15 2HZ
Received
around 27 Nov 2025
Validated
27 Nov 2025
Ward
Stratford
Parish
Stratford Community Forum
Case officer
Show
Applicant
Show
Agent
Tibbalds Planning and Urban Design

Public comments

No public comments yet.

Last counted 14 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions
170 refused in the year to March 2026