The Grange Low Road Tasburgh Norfolk NR15 1AR Data via plota.co.uk

2026/1309 - Full Approved

Proposal

Installation of ground mounted solar photovoltaic array Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 May 2026
✓
Validated
9 Jun 2026
✓
Consultation
10 Jun 2026
✓
Approved
14 Jul 2026

Approved on 14 Jul 2026 · Delegated · Last checked 8 Sept 2026

Site constraints 9

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 827 m away: East Pye Solar
The site is 827 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument 157 m away: Camp in village
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
2 listed buildings within 150 m; Radon affected area, class 2; Inside the Tasburgh built-up area; Priority habitat 15 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
NR15 1AR
Received
6 May 2026
Validated
9 Jun 2026
Ward
Hempnall
Parish
Tasburgh
Case officer
Show
Target decision
4 Aug 2026
Decision
Approval with Conditions
Decision date
14 Jul 2026
Decision level
Delegated
Applicant
Show
Agent
Collective Community Planning

How this decision compares

Decided in 35 days from validation, 45 days faster than South Norfolk Broadland's median of 80 for full applications. Approved, as 87% of full applications here are.

29%decided within 8 weeks
87%approved
196decided in the last year

Plota live figures for full applications decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

5 neighbours consulted · Last counted 8 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14914052
Planning Portal ref
PP-14914052
Neighbours
10 Jun 2026
Consultation
10 Jun 2026
Comments by
3 Jul 2026
Site or press notice
12 Jun 2026
Statutory expiry
4 Aug 2026
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Householder decisions

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026