Land North Of Sweetlands Low Road Tasburgh Norfolk Data via plota.co.uk

2026/3415 - Full Pending Consideration

Proposal

Retention of amenity land. Regularisation application for the erection of fence panels and gate to boundary and hardcore surfacing. (Retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Nov 2026
✓
Consultation
18 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Jan 2027, from South Norfolk Broadland's recent extensions.

Comments are open until 9 Dec 2026

Comment on this application ↗

Site constraints 6

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project 923 m away: East Pye Solar
The site is 923 m from the project boundary. Generating station, under examination.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m; Scheduled monument 242 m away: Camp in village; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 19 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Received
16 Nov 2026
Validated
16 Nov 2026
Ward
Hempnall
Parish
Tasburgh
Target decision
11 Jan 2027
Decision level
Schedule 2
Applicant
Show
Agent
Howe and Boosey Architectural Services ltd

Decision outlook

Day 7 of the 56-day target. South Norfolk Broadland usually decides extensions by day 55.

Day 749 days to the 56-day target
64%decided within 8 weeks
96%approved
802decided in the last year

Plota live figures for extensions decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15328655
Planning Portal ref
PP-15328655
Neighbours
18 Nov 2026
Consultation
18 Nov 2026
Comments by
9 Dec 2026
Statutory expiry
11 Jan 2027
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 overall
Relevant to this application:
Householder decisions

South Norfolk Broadland is #136 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026