508 Gilbert House Barbican London EC2Y 8BD Data via plota.co.uk

25/01626/LBC - Listed Building Consent Approved

Proposal

The application seeks listed building consent for minor internal alterations including removal of wall between living room and bedroom and installation of pocket doors; removal of 2no. doors in hallway including 1no. replacement with full height pivot door and sliding pocket door to bedroom; removal of wall between kitchen and living room; and removal of 1no. doors to kitchen. Part removal of wall between wc and bathroom; and removal of 1no. door to bathroom and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Nov 2025
✓
Consultation
12 Dec 2025
✓
Approved
29 Jan 2026

Approved on 29 Jan 2026 · Delegated Decision · Last checked 10 Oct 2026

Site constraints 12

4 listed buildings within 150 m of the postcode pin
Nearest: Barbican, Grade II, the postcode pin is inside its outline · 1 Grade I, 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Registered park or garden: The Barbican
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Barbican and Golden Lane conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Designated open space
Borough-designated open space.
Loss of protected open space is resisted unless it is replaced by space of equal or better quality nearby.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument about 80 m away: London Wall: site of the Roman and medieval gateway of Cripple Gate
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project about 787 m away: Thames Tideway Tunnel
The site is about 787 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 261 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre about 6 m away: Barbican.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
EC2Y 8BD
Received
19 Nov 2025
Validated
19 Nov 2025
Ward
Cripplegate
Case officer
Show
Target decision
14 Jan 2026
Decision
Approved
Decision date
29 Jan 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Hapa Architects

How this decision compares

Decided in 71 days from validation, about the council's usual 73 days. Approved, as 100% of listed building works here are.

27%decided within 8 weeks
100%approved
149decided in the last year

Plota live figures for listed building works decided by City of London in the last twelve months, from validation. City of London decision record →

Public comments

No public comments yet.

Last counted 10 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14501349
Planning Portal ref
PP-14501349
Comments by
6 Jan 2026
Site or press notice
12 Dec 2025
Committee
29 Jan 2026
Statutory expiry
14 Jan 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Other decisions

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026