Marwell Wildlife Thompsons Lane Owslebury Hampshire SO21 1JH Data via plota.co.uk

SDNP/25/04799/FUL - Full Application Approved

Proposal

Installation of off grid electric vehicle charging system using solar panels and generator backup. We are requesting temporary permission for a period up to 3 years. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Dec 2025
✓
Validated
16 Jan 2026
✓
Approved
23 Mar 2026

Approved on 23 Mar 2026 · LA Delegated Decision · Last checked 24 Sept 2026

Associated applications 2

  • FullApprovedSDNP/25/04799/FULThis application
    Installation of off grid electric vehicle charging system using solar panels and generator backup. We are requesting temporary…

    Conditions 3, 5 discharged

Site constraints 10

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
South Downs National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Ancient woodland 8 m away: Vineyard Copse
Inside the 15 m buffer standing advice asks for from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Scheduled monument 39 m away: Park pale at Marwell, south-east of Cowleaze Copse
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Public bridleway 24 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Ancient Semi Natural Woodland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project 1.2 km away: Hampshire Water Transfer and Water Recycling Project; Priority habitat 8 m away: Deciduous woodland; Inside the Fisher's Pond built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area355 m² (3,821 sq ft)
Energy ratingC (asset rating 67)
UseD1 Non-residential Institutions - Community/Day Centre
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in April 2019, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO21 1JH
Received
2 Dec 2025
Validated
16 Jan 2026
Ward
Upper Meon Valley Ward
Parish
Owslebury and Morestead Parish Council
Case officer
Show
Target decision
23 Mar 2026
Decision
Approved
Decision date
23 Mar 2026
Decision level
LA Delegated Decision
Applicant
Show
Agent
Studio BAD
Freehold owner
Show

How this decision compares

Decided in 66 days from validation, 12 days slower than South Downs's median of 54 for utility and infrastructure works. Approved, as 97% of utility and infrastructure works here are.

60%decided within 8 weeks
97%approved
127decided in the last year

Plota live figures for utility and infrastructure works decided by South Downs in the last twelve months, from validation. South Downs decision record →

Public comments

1comment received
1 neutral

Last counted 24 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14495070
Planning Portal ref
PP-14495070
Statutory expiry
13 Mar 2026
Env. assessment
No

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.