Barton Vale Farm, Caistor Road, Barrow Upon Humber, Barton Upon Humber, DN18 6DY Data via plota.co.uk

PA/2026/345 - Prior notification Approved

Proposal

Application to determine if prior approval is required to erect a livestock building Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 26 Mar 2026
✓
Approved
15 Apr 2026

Approved on 15 Apr 2026 · Last checked 24 Sept 2026

Site constraints 2

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project 491 m away: Humber Carbon Capture Pipeline, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area202 m² (2,174 sq ft)
Energy ratingD (60 out of 100), could reach C
PropertyDetached house, 10 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, oil
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in July 2012, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in North Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior notification
Postcode
DN18 6DY
Received
around 26 Mar 2026
Validated
26 Mar 2026
Ward
Barton
Parish
Barton upon Humber
Case officer
Show
Decision
Not Required
Decision date
15 Apr 2026

How this decision compares

Decided in 20 days from validation, 9 days faster than North Lincs's median of 29 for prior approvals. Approved, as 89% of prior approvals here are.

100%decided within 8 weeks
89%approved
78decided in the last year

Plota live figures for prior approvals decided by North Lincs in the last twelve months, from validation. North Lincs decision record →

Consultation & key dates

Comments by
11 Apr 2026
North Lincs
Planning Authority Score
4.6/10
Below average
#169 of 296 overall
Relevant to this application:
Householder decisions

North Lincs is #123 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Lincs decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #195 of 296
91%
Householder approved
Above avg (90%) #177 of 296
70%
Decided in 8 weeks
Above avg (63%) #123 of 296
44%
Extended time limit
Above avg (41%) #182 of 296
70%
Minor dwellings approved
114 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
78%
Change of use approved
37 decided
705
Total decisions
96 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.