MEYSYDD, Cribyn, Lampeter, Ceredigion, SA48 7NA Data via plota.co.uk

Proposal

Dymchwel adeiladau allanol presennol (adeiladwyd yn wreiddiol tua 1990au) a'u amnewid am adeilad newydd ar gyfer ei ddefnyddio fel gweithdy a sied storio ar gyfer busnes adeiladu teuluol lleol. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Jun 2025
✓
Validated
1 Jul 2025
✓
Approved
12 Dec 2025

Approved on 12 Dec 2025 · Planning Committee Main Item / Prif Eitem · Last checked 18 Oct 2026

Planning committee

Decided by Ceredigion Development Management Committee on 10 Dec 2025.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • Demolition of 1990s outbuildings and their replacement with a workshop and storage shed for a local family building business was proposed at Meysydd, Cribyn.
  • The committee approved the application subject to conditions.

Source: Plota analysis of Ceredigion's committee minutes, Ceredigion Development Management Committee minutes, 10 December 2025 .

Site constraints 3

Nutrient neutrality catchment: Afon Teifi
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ceredigion - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ceredigion
Application type
Full Planning
Postcode
SA48 7NA
Received
18 Jun 2025
Validated
1 Jul 2025
Ward
Llanfihangel Ystrad ED
Parish
Llanfihangel Ystrad Community
Case officer
Show
Target decision
12 Dec 2025
Decision
Approved Subject to Conditions
Decision date
12 Dec 2025
Decision level
Planning Committee Main Item / Prif Eitem
Applicant
Show
Agent
Iwan Thomas

How this decision compares

Decided in 164 days from validation, 109 days slower than Ceredigion's median of 55 for commercial and major works. Approved, as 79% of commercial and major works here are.

57%decided within 8 weeks
79%approved
6%go to committee

Plota live figures for commercial and major works decided by Ceredigion in the last twelve months, from validation. Ceredigion decision record →

Consultation & key dates

Committee
10 Dec 2025
Statutory expiry
12 Dec 2025