Land at SX 445 809 (Quither Farm) Milton Abbot Data via plota.co.uk

2978/26/OPA - Outline Planning Application Within Consultation Period

Proposal

Self build permanent agricultural workers dwelling with all matters reserved Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
✓
Validated
9 Nov 2026
Decision
Expected by 4 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Dec 2026, from West Devon's recent agricultural works.

Comments are open until 17 Dec 2026

Comment on this application ↗

Site constraints 6

40 listed buildings within 150 m of the postcode pin
Nearest: Courtice Headstone About 8 Metres West of the Tower of the Church of St Constantine, Grade II, about 26 m from the postcode pin · 1 Grade I, 39 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 40 with distances
Historic England ↗
Public footpath about 1 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Milton Abbot conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National landscape about 225 m away: Tamar Valley.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 12 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
West Devon
Application type
Outline Planning Application
Received
26 Oct 2026
Validated
9 Nov 2026
Ward
Milton Ford
Parish
Milton Abbot
Case officer
Show
Applicant
Show
Agent
Greenslade Taylor Hunt

Decision outlook

Day 14 of the 56-day target. West Devon usually decides agricultural works by day 49.

Day 1442 days to the 56-day target
82%decided within 8 weeks
74%approved
113decided in the last year

Plota live figures for agricultural works decided by West Devon in the last twelve months, from validation. West Devon decision record →

Consultation & key dates

Consultation
11 Nov 2026
Comments by
17 Dec 2026