East Beach Open Space East Beach Shoeburyness Southend-on-sea Essex Data via plota.co.uk

25/01213/BC3 - Borough Council Regulation 3 Approved

Proposal

Construct an accessible play area in an existing area of amenity grass, including collection of accessible and inclusive play equipment aimed at a range of ages and abilities, install new low-level boundary fencing, access paths, soft landscaping and planted boundary mounds and install cycle parking Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Aug 2025
✓
Validated
1 Sept 2025
✓
Approved
11 Dec 2025

Approved on 11 Dec 2025 · Development Control Committee · Last checked 8 Nov 2026

Planning committee

Decided by Southend Planning Committee on 10 Dec 2025.

Approved

As officers recommended.

  • Officers advised approval because the accessible play area would improve recreation, planting, biodiversity and local play provision without significant harm.
  • A neighbouring objector raised concerns about walking space, beach access, the sandpit and the site’s location.
  • The committee granted permission subject to conditions.
Read how the committee decided The proposal, site, officer assessment, consultation responses, objection, and committee decision with conditions. Includes the meeting recording

Source: Plota analysis of Southend's committee minutes of 10 Dec 2025.

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Southend to Wallasea Island 9 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Special area of conservation 28 m away: Essex Estuaries
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI 28 m away: Benfleet and Southend Marshes SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Priority habitat 36 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southend - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southend
Application type
Borough Council Regulation 3
Received
29 Aug 2025
Validated
1 Sept 2025
Ward
Shoeburyness
Case officer
Show
Target decision
12 Dec 2025
Decision
Grant Conditional Permission
Decision date
11 Dec 2025
Decision level
Development Control Committee
Applicant
Show
Agent
Ares Landscape Architects

How this decision compares

Decided in 101 days from validation, 41 days slower than Southend's median of 60 for full applications. Approved, as 77% of full applications here are.

47%decided within 8 weeks
77%approved
6%go to committee

Plota live figures for full applications decided by Southend in the last twelve months, from validation. Southend decision record →

Public comments

1comment received
1 objecting

3 neighbours consulted · Last counted 8 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Committee
10 Dec 2025
Statutory expiry
27 Oct 2025
Env. assessment
No
Southend
Planning Authority Score
3.8/10
Below average
#209 of 296 overall
Relevant to this application:
Householder decisions

Southend is #155 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southend decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #261 of 296
88%
Householder approved
Below avg (90%) #224 of 296
64%
Decided in 8 weeks
Above avg (63%) #155 of 296
43%
Extended time limit
Above avg (41%) #173 of 296
62%
Minor dwellings approved
109 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
56%
Change of use approved
82 decided
904
Total decisions
177 refused in the year to March 2026