Aspen Works Aspen Lane Earby Lancashire BB18 6QR Data via plota.co.uk

25/0312/CND - Discharge Condition Approved

Proposal

Approval of Details Reserved by Condition: Discharge Condition 4 (Site Access arrangements) and Condition 5 (Movement of vehicles) of Planning Permission . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 May 2025
✓
Validated
12 May 2025
✓
Consultation
12 May 2025
✓
Approved
10 Jul 2025

Approved on 10 Jul 2025 · Delegated Decision · Last checked 8 Nov 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 4, 5 discharged

    • ConditionsApproval of Details Reserved by Condition: Discharge Condition 4 (Site Access arrangements)…This application25/0312/CND

Site constraints 5

Earby conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
2 listed buildings within 150 m; Inside the Earby built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 8 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area126 m² (1,356 sq ft)
Energy ratingC (73 out of 100), could reach A
PropertySemi-detached house
Built2023
HeatingAir source heat pump, underfloor, electric
WallsAverage thermal transmittance 0.16 W/m²K

From the energy performance certificate lodged in November 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Pendle - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Pendle
Application type
Discharge Condition
Postcode
BB18 6QR
Received
8 May 2025
Validated
12 May 2025
Ward
Earby & Coates
Parish
Earby Town Council
Case officer
Show
Target decision
15 Jul 2025
Decision
Conditions Discharged
Decision date
10 Jul 2025
Decision level
Delegated Decision
Applicant
Show
Agent
J. and L. B. Design

Public comments

No public comments yet.

Last counted 8 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14002497
Planning Portal ref
PP-14002497
Consultation
12 May 2025
Comments by
2 Jun 2025
Statutory expiry
7 Jul 2025
Env. assessment
No
Pendle
Planning Authority Score
4.7/10
Below average
#166 of 296 overall
Relevant to this application:
Householder decisions

Pendle is #153 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Pendle decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #175 of 296
87%
Householder approved
Below avg (90%) #234 of 296
64%
Decided in 8 weeks
Above avg (63%) #153 of 296
34%
Extended time limit
Below avg (41%) #89 of 296
84%
Minor dwellings approved
95 decided (1-9 homes)
67%
Major dwellings approved
6 decided (10+ homes)
75%
Change of use approved
20 decided
441
Total decisions
58 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.