THE SPARK NEWCASTLE HELIX Draymans Way, Newcastle Upon Tyne, NE4 5DE Data via plota.co.uk

2025/1099/01/DET - Detailed Application Approved

Proposal

Change of use of part ground, part first - third floors from Use Class E and Sui Generis (former A4 use) to flexible Class E, and/or Use Class F1(a) (educational), and / or Sui Generis (former A4 use) at level 01 and 02 unit. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jul 2025
✓
Approved
24 Sept 2025

Approved on 24 Sept 2025 · Delegated decision · Last checked 18 Oct 2026

Site constraints 4

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: about 29 m from the postcode pin (reference 424564-021). 2 recorded mine entries within 50 m.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
8 listed buildings within 150 m of the postcode pin; Scheduled monument about 199 m away: Newcastle upon Tyne town defences: section of curtain wall containing Ever, Morden and Heber towers, two turrets and two sections of town ditch; Inside the Newcastle upon Tyne built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newcastle upon Tyne - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Detailed Application
Postcode
NE4 5DE
Received
15 Jul 2025
Validated
15 Jul 2025
Ward
y_Arthurs Hill (up to May 2026)
Case officer
Show
Target decision
26 Sept 2025
Decision
Grant Conditionally
Decision date
24 Sept 2025
Decision level
Delegated decision
Applicant
Show
Agent
Savills

How this decision compares

Decided in 71 days from validation, 15 days slower than Newcastle upon Tyne's median of 56 for changes of use. Approved, as 84% of changes of use here are.

50%decided within 8 weeks
84%approved
134decided in the last year

Plota live figures for changes of use decided by Newcastle upon Tyne in the last twelve months, from validation. Newcastle upon Tyne decision record →

Consultation & key dates

Statutory expiry
26 Sept 2025
Newcastle upon Tyne
Planning Authority Score
4.9/10
Below average
#154 of 296 overall
Relevant to this application:
Change of use

Newcastle upon Tyne is slower than most councils at deciding householder applications: #205 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newcastle upon Tyne decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #113 of 296
95%
Householder approved
Above avg (90%) #86 of 296
56%
Decided in 8 weeks
Below avg (63%) #205 of 296
42%
Extended time limit
Above avg (41%) #165 of 296
84%
Minor dwellings approved
37 decided (1-9 homes)
95%
Major dwellings approved
22 decided (10+ homes)
71%
Change of use approved
70 decided
1,005
Total decisions
103 refused in the year to March 2026