PRINTWORKS Rutherford Street, Newcastle Upon Tyne Data via plota.co.uk

2026/1631/01/LBC - Listed Building Consent Pending Consideration

Proposal

Listed Building Application: External repairs to include Window repair, refurbishment and redecoration; rainwater goods repair and redecoration; leadwork refurbishment; roof covering repairs; masonry repairs and repointing; steelwork redecoration. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Sept 2026
✓
Validated
3 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Dec 2026 and 15 Jan 2027, from Newcastle upon Tyne's recent listed building works.

Site constraints 6

Grade II listed: Former Cooperative Wholesale Society Printing Works
List entry 1024803 · The pin is inside its outline · 13 more listed buildings within 150 m (5 Grade I, 7 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 13 with distances
Historic England ↗
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Scheduled monument 31 m away: Newcastle upon Tyne town defences: section of curtain wall containing Ever, Morden and Heber towers, two turrets and two sections of town ditch
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Air quality management area: AQMA No.1b (City Centre)
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Newcastle upon Tyne built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 7 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newcastle upon Tyne - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Received
29 Sept 2026
Validated
3 Nov 2026
Ward
Monument
Parish
Not Within A Parish Boundary
Case officer
Show
Target decision
29 Dec 2026
Decision level
Delegated decision
Applicant
Show
Agent
Building Surveyors Limited

Decision outlook

Day 20 of the 56-day target. Newcastle upon Tyne usually decides listed building works by day 65.

Day 2045 days to the predicted decision (day 65)
36%decided within 8 weeks
98%approved
200decided in the last year

Plota live figures for listed building works decided by Newcastle upon Tyne in the last twelve months, from validation. Newcastle upon Tyne decision record →

Consultation & key dates

Statutory expiry
29 Dec 2026
Newcastle upon Tyne
Planning Authority Score
4.9/10
Below average
#154 of 296 overall
Relevant to this application:
Other decisions

Newcastle upon Tyne is slower than most councils at deciding householder applications: #205 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newcastle upon Tyne decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #113 of 296
95%
Householder approved
Above avg (90%) #86 of 296
56%
Decided in 8 weeks
Below avg (63%) #205 of 296
42%
Extended time limit
Above avg (41%) #165 of 296
84%
Minor dwellings approved
37 decided (1-9 homes)
95%
Major dwellings approved
22 decided (10+ homes)
71%
Change of use approved
70 decided
1,005
Total decisions
103 refused in the year to March 2026