Light Railway Restaurant, Dungeness Road, Dungeness, Romney Marsh, TN29 9NA Data via plota.co.uk

25/2092/FH/PA - Prior approval Part 14 Class J Approved

Proposal

Determination as to whether the prior approval of the Local Planning Authority is required under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for the installation of roof mounted solar panels. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Nov 2025
✓
Validated
21 Nov 2025
✓
Approved
9 Jan 2026

Approved on 9 Jan 2026 · Last checked 8 Oct 2026

Site constraints 8

Special area of conservation: Dungeness
2 designations overlap here. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI: Rye Harbour SSSI
Natural England must be consulted on work that may affect it.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Dungeness conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public footpath about 17 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Coastal vegetated shingle
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 319 m away: South Brooks Solar Farm, at pre-application; Priority habitat about 14 m away: Coastal vegetated shingle.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Shepway - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shepway
Application type
Prior approval Part 14 Class J
Postcode
TN29 9NA
Received
14 Nov 2025
Validated
21 Nov 2025
Ward
Walland & Denge Marsh
Parish
Lydd
Case officer
Show
Target decision
16 Jan 2026
Decision
Prior approval not required
Decision date
9 Jan 2026

How this decision compares

Decided in 49 days from validation, 12 days slower than Shepway's median of 37 for prior approvals. Approved, as 81% of prior approvals here are.

96%decided within 8 weeks
81%approved
52decided in the last year

Plota live figures for prior approvals decided by Shepway in the last twelve months, from validation. Shepway decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
2 Jan 2026
Shepway
Planning Authority Score
7.4/10
Good
#49 of 296 overall
Relevant to this application:
Householder decisions

Shepway is one of the fastest councils in England for householder decisions: #5 of 296 on speed. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shepway decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #247 of 296
88%
Householder approved
Below avg (90%) #219 of 296
96%
Decided in 8 weeks
Above avg (63%) #5 of 296
12%
Extended time limit
Below avg (41%) #5 of 296
61%
Minor dwellings approved
95 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
32 decided
761
Total decisions
139 refused in the year to March 2026