Park Reach 102 Chapel Road Southampton Data via plota.co.uk

26/00244/TPO - Tree Preservation Order Awaiting decision

Proposal

T1 + T2 - Lime - Crown raise at all compass points to 4 meters above ground level. No height or spread will be affected by these works. Remove epicormic growth Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 30 Sept 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from Southampton's recent tree and landscaping works.

Site constraints 8

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
2 listed buildings within 150 m
Nearest: Walls to North and North-West of the Deanery, Grade II, 56 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Registered park or garden 146 m away: Central Parks; Special protection area 461 m away: Solent and Dorset Coast; Inside the Southampton built-up area; National infrastructure project 1521 m away: Solent Gateway 2, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Preservation Order
Received
around 30 Sept 2026
Validated
30 Sept 2026
Ward
Bargate
Case officer
Show
Target decision
25 Nov 2026
Applicant
Show
Agent
Alpine Tree Surgeons Ltd

Decision outlook

Day 9 of the 56-day target. Southampton usually decides tree and landscaping works by day 54.

Day 947 days to the 56-day target
69%decided within 8 weeks
92%approved
225decided in the last year

Plota live figures for tree and landscaping works decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
1986
Statutory expiry
25 Nov 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Householder decisions

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026