25/01124/LBC - Listed Building Consent Approved

Proposal

Minor works to existing steps and ramps at Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Sept 2025
✓
Consultation
16 Sept 2025
✓
Approved
6 Nov 2025

Approved on 6 Nov 2025 · Delegated Power · Last checked 18 Oct 2026

Site constraints 4

Grade B listed: Primary School, Mary Avenue, Aberlour
List entry LB20870 · 1 m away · 1 more listed building within 150 m (1 Grade B)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic Environment Scotland ↗
Special area of conservation 224 m away: River Spey
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
SSSI 283 m away: River Spey.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Moray - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Moray
Application type
Listed Building Consent
Postcode
AB38 9PN
Received
9 Sept 2025
Validated
9 Sept 2025
Ward
Speyside Glenlivet
Parish
Speyside
Case officer
Show
Target decision
4 Nov 2025
Decision
Permitted
Decision date
6 Nov 2025
Decision level
Delegated Power
Applicant
Show

How this decision compares

Decided in 58 days from validation, 7 days faster than Moray's median of 65 for listed building works. Approved, as 98% of listed building works here are.

33%decided within 8 weeks
98%approved
64decided in the last year

Plota live figures for listed building works decided by Moray in the last twelve months, from validation. Moray decision record →

Public comments

No public comments yet.

Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
16 Sept 2025
Comments by
16 Oct 2025
Site or press notice
26 Sept 2025
Statutory expiry
4 Nov 2025
Env. assessment
No