9 Fernbank Place, Ascot, SL5 8HJ Data via plota.co.uk

PA/2026/1003 - Householder planning permission Valid

Proposal

Proposed single storey rear extension following the removal of an outbuilding. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Oct 2026
✓
Validated
4 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 29 Dec 2026 and 7 Jan 2027, from Bracknell Forest's recent extensions.

Comments are open until 1 Dec 2026

Comment on this application ↗

Site constraints 1

Also on the record
Inside the North Ascot built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area81 m² (872 sq ft)
Energy ratingD (66 out of 100), could reach B
PropertySemi-detached house, 4 habitable rooms
Built1950 to 1966
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in October 2012, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Bracknell Forest - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder planning permission
Postcode
SL5 8HJ
Received
26 Oct 2026
Validated
4 Nov 2026
Ward
Winkfield and Warfield East
Parish
Winkfield Parish Council
Case officer
Show
Target decision
30 Dec 2026
Decision level
Delegated Decision
Applicant
Show
Agent
David Herbert Architects David Herbert

Decision outlook

Day 19 of the 56-day target. Bracknell Forest usually decides extensions by day 59.

Day 1940 days to the predicted decision (day 59)
47%decided within 8 weeks
98%approved
294decided in the last year

Plota live figures for extensions decided by Bracknell Forest in the last twelve months, from validation. Bracknell Forest decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
1 Dec 2026
Bracknell Forest
Planning Authority Score
2.4/10
Poor
#254 of 296 overall
Relevant to this application:
Householder decisions

Bracknell Forest is one of the slowest councils in England for householder decisions: #269 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bracknell Forest decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #125 of 296
92%
Householder approved
Above avg (90%) #147 of 296
38%
Decided in 8 weeks
Below avg (63%) #269 of 296
59%
Extended time limit
Above avg (41%) #263 of 296
81%
Minor dwellings approved
26 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
83%
Change of use approved
30 decided
502
Total decisions
53 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.